SAR Peterborough-Quorn
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 24: | Line 24: | ||
<td align="right"> <!-- Insert "Junction for"/Terminus/Broad Gauge graphics --> | <td align="right"> <!-- Insert "Junction for"/Terminus/Broad Gauge graphics --> | ||
− | <span style="font-weight: 700; color: white;">Junction for</span> [[Image:BrokenHillLine.png|link=|alt=Broken Hill Line]][[Image:TerowieLine.png|link=|alt=Terowie Line]] | + | <span style="font-weight: 700; color: white;">Junction for</span> [[Image:BrokenHillLine.png|link=SAR Port Pirie-Broken Hill|alt=Broken Hill Line|Port Pirie-Broken Hill Line]][[Image:TerowieLine.png|link=SAR Peterborough-Terowie|alt=Terowie Line|Peterborough-Terowie Line]] |
</td> | </td> | ||
Line 194: | Line 194: | ||
<span style="font-weight: 700; background-color: black; color: white;">Length: </span> 137km<br><br> | <span style="font-weight: 700; background-color: black; color: white;">Length: </span> 137km<br><br> | ||
− | Built as a narrow gauge ( | + | Built as a narrow gauge (3ft6in - 1067mm) line from '''Peterborough''' to '''Orroroo''' in 1881, it was extended to '''Quorn''' in 1882 where it joined the '''SAR Main Northern Line''' (narrow gauge) from '''Port Augusta''' to '''Oodnadatta'''. The '''Northern Line''' was transferred to the '''Commonwealth Railways''', was renamed the '''Central Australia Railway''' and was extended to '''Alice Springs''' in the early 1920s. <br> |
− | When the standard gauge ( | + | When the standard gauge (4ft8.5in - 1435mm) '''Transcontinental Railway''' from '''Port Augusta''' to '''Kalgoolie''' was completed in 1917, the '''Peterborough-Quorn Line''' became the route for all Transcontinental and Central Australia rail traffic until 1932 when a more direct broad gauge (5ft3in - 1600mm) line from '''Port Pirie''' to '''Port Augusta''' was completed.<br> |
During the 1940s many of the passing loops on the line were lengthened to handle the longer troop and military freight trains. During the 1950s the main '''Central Australia Railway''' was diverted away from '''Quorn''' and the remaining line was truncated at '''Hawker'''. This significantly reduced the traffic and led to the removal of several passing loops on the '''Peterborough-Quorn''' line. The line from '''Port Pirie''' to '''Broken Hill''' was converted to standard gauge during 1969-1970 which isolated the '''Peterborough-Quorn''' line from the rest of the narrow gauge network ('''Port Augusta''' to '''Quorn''' line was closed in 1956).<br> | During the 1940s many of the passing loops on the line were lengthened to handle the longer troop and military freight trains. During the 1950s the main '''Central Australia Railway''' was diverted away from '''Quorn''' and the remaining line was truncated at '''Hawker'''. This significantly reduced the traffic and led to the removal of several passing loops on the '''Peterborough-Quorn''' line. The line from '''Port Pirie''' to '''Broken Hill''' was converted to standard gauge during 1969-1970 which isolated the '''Peterborough-Quorn''' line from the rest of the narrow gauge network ('''Port Augusta''' to '''Quorn''' line was closed in 1956).<br> |