SAR Peterborough Base Session V2
From TrainzOnline
A set of scenarios to use with the SAR Peterborough Narrow Gauge Division layouts. The V1.0 layout and scenarions are for TRS19 (SP3) and above. The V2.0 layout and scenarions are for Trainz Plus and TRS22. The scenarios replicate, as far as possible, some of the operations that existed in the division from the 1920s (Vintage East-West Express) until the present (The "Coffee Pot" Special) but most are set in the 1950s and 1960s. All rolling stock, industry and other settings are provided in the session. There are no AI controlled trains other than those you add yourself. |
SAR Peterborough Division Scenarios V2 | |
Links: (all links will open in this window) | For the original (V1) version of these scenarios, click here |
Scenario Name | Run Time (approx) | Scenario Name | Run Time (approx) |
In SAR Peterborough Base Session v1.0 and v2.0 | ||||
Most of the v1.0 scenarios ( 1 to 15 ) have been updated with new rolling stock and/or tasks in SAR Peterborough Base Session v2.0. Each updated scenario includes a link to the original v1.0 scenario | ||||
1 Gladstone-Peterborough Depot Fuel | 2 hrs | 2 Vintage East-West Passenger Express | 3 hrs | |
3 Gladstone-Wilmington Local Freight | 3 hrs | 4 Gladstone-Terowie Passenger Runs | 35 min to Jamestown 1 hr 40 mins to Terowie |
|
5 Paratoo-Gladstone Bulk Ore | 1 hr 25 min to Peterborough 2 hrs 45 mins to Gladstone |
6 Gladstone-Paratoo Empty Ore | 1 hr 25 min to Peterborough 2 hrs 45 mins to Paratoo |
|
7 Peterborough-Quorn Local Freight | 2 - 5 hrs | 8 Quorn-Peterborough Empty Fuel | 3 hrs | |
9 Peterborough-Paratoo Mixed Service | 1 hr 40 min | 10 Transcontinental Express Freight | 2 hrs 15 min to Terowie 3 hrs to Gladstone 7 hrs 30 minutes to Quorn |
|
11 Peterborough-Quorn Grain | up to 6 hrs | 12 Peterborough Shunter | 1 hr | |
13 Gladstone Shunter | 40 min | 14 Terowie Shunter | 50 min | |
15 Quorn Shunter | 40 min | |||
In SAR Peterborough Base Session v2.0 | ||||
16 Gladstone to Wilmington Railmotor | 1 hr 20 min | 17 Peterborough to Quorn Local Passenger | various from 3hrs | |
18 Gladstone Pickup Grain | 2 hr 30 min Peterborough to Gladstone | 19 Servicing the Broad Gauge Express | 25 min | |
20 Gladstone-Laura-Gladstone Test Run | 40 min | 21 Terowie-Paratoo Livestock | Terowie to Paratoo return 5 hrs | |
22 Gladstone Local Livestock | Various from 1 hr | 23 Rail Car Inspection Run | Various | |
24 Peterborough Dieselisation | Various from 2 hrs | 25 The "Coffee Pot" Special | 50 min to Woolshed Flat | |
26 CR Quorn to Hawker Freight | 2 hrs to Hawker | |||
SAR Peterborough Base Session v2.0 provides all the additional rolling stock needed to run the v2.0 only scenarios. SAR Peterborough Narrow Gauge Division v2.0 updates the route to provide the additional assets required by many of the v2.0 only scenarios and the additional trackage (Woolshed Flat to Hawker) required by some of them. |
Tutorial:
|
|
Links: (all links will open in this window) | |||||||
Location Index |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in January 2021 and was last updated as shown below.