SAR Peterborough Base Session V1
From TrainzOnline
A set of scenarios to use with the SAR Peterborough Narrow Gauge Division layout for TRS19. The scenarios replicate, as far as possible, some of the operations that existed in the division from the 1920s until 1988 but most are set in the late 1960s. All rolling stock, industry and other settings are provided in the session. There are no AI controlled trains other than those you add yourself. |
SAR Peterborough Division Scenarios V1 | |
Links: (all links will open in this window) | For the latest (V2) version of these scenarios, click here |
Scenario Name | Run Time (approx) | Scenario Name | Run Time (approx) |
1 | Gladstone-Peterborough Depot Fuel | 2 hrs | 2 | Vintage East-West Passenger Express | 3 hrs | |
3 | Gladstone-Wilmington Local Freight | 3 hrs | 4 | Gladstone-Terowie Passenger | Jamestown 35 min Terowie 1 hr 40 mins |
|
5 | Paratoo-Gladstone Bulk Ore | Peterborough 1 hr 25 min Gladstone 2 hrs 45 mins |
6 | Gladstone-Paratoo Empty Ore | Peterborough 1 hr 25 min Paratoo 2 hrs 45 mins |
|
7 | Quorn-Peterborough Local Freight | 3 hrs 30 min | 8 | Quorn-Peterborough Empty Fuel | 3 hrs | |
9 | Peterborough-Paratoo Mixed Service | 1 hr 40 min | 10 | Paratoo-Gladstone/Terowie Express Freight | Terowie 2 hrs 15 min Gladstone 3 hrs |
|
11 | Orroroo Grain Run | 2 hrs 30 min | 12 | Peterborough Shunter | 1 hr | |
13 | Gladstone Shunter | 40 min | 14 | Terowie Shunter | 50 min | |
15 | Quorn Shunter | 40 min |
Tutorial:
|
|
Links: (all links will open in this window) | |||||||
Location Index |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in January 2021 and was last updated as shown below.