How to Merge Routes
Contents |
Merging Routes
The Merge Routes option in the Surveyor Main Menu allows two different routes to be joined together. |
Before You Start Merging
Before you start the merge there are some important points you will need to consider and there may be some preparation work that will have to be performed.
- Identify
- which route will be the base route that will form the backbone of the combined routes. This will usually be the larger route or the route that contains Session data that you want to keep in the merge.
- the route that will be the merged route that will be joined to the base route.
- the orientation (North-South or East-West) of the routes to be merged. Are they the same or different?
- exactly where the merge will occur in both routes.
- the height of the baseboards in the base route and the merged route at the merge point. Are they exactly the same height?
Common Problems
Most route mergers will have problems. Some problems will be identified and fixed during the merging process. Others may require you to do a bit (or a lot) of extra work before you can merge two routes into one. For some problems the best solution is to select different routes to merge.
Selecting and Loading the Routes to Merge
- Load the Base Route into Surveyor
- Should you load the Route or the Session?
- The answer depends on whether or not a Session has been created for the base route and if that Session contains assets (scenery, consists) and settings (rules, driver commands, industry and wagon loads, weather, time of day, etc) that you want to continue to use in the new merged Route and Session. If the Session contains nothing that you need then load the Route only into Surveyor. Note that when you add the merged route only the Route assets and data will be loaded, no Session assets or data will be loaded.
- Should you load the Route or the Session?
This will merge the two routes and display a "minimap" of the new combined routes with some control options.
The Merge Map
The Merge MiniMap has similar controls to the MiniMaps in the Driver and Surveyor.
In Terrain View:-
In the example shown on the left, the terrain conflict can be removed by moving the merged route to the left (clicking the left arrow) until the last red baseboard disappears. |
The merge will not proceed until ALL the conflicts have been eliminated.
- Move the merged route into its new position
- Move the merged route into its new position