How to Merge Routes
From TrainzOnline
(Difference between revisions)
m (→Selecting and Loading the Routes to Merge) |
m (→The Merge Map) |
||
Line 83: | Line 83: | ||
<tr valign="top"> | <tr valign="top"> | ||
<td>[[file:MergeMiniMapComplexTerrain01.JPG]]</td> | <td>[[file:MergeMiniMapComplexTerrain01.JPG]]</td> | ||
− | <td> | + | <td> |
− | + | ||
*The two tabs shown on the left are the:- | *The two tabs shown on the left are the:- | ||
**'''Terrain Tab''' which is automatically selected when the MiniMap is first displayed. This shows the baseboards of the ''merged route'' superimposed on the baseboards of the ''base route''. A red background colour on this tab, as shown in the figure on the left, indicates that the two routes have baseboards that are in conflict - they are overlapping. The overlapping baseboards are shown in red on the MiniMap. | **'''Terrain Tab''' which is automatically selected when the MiniMap is first displayed. This shows the baseboards of the ''merged route'' superimposed on the baseboards of the ''base route''. A red background colour on this tab, as shown in the figure on the left, indicates that the two routes have baseboards that are in conflict - they are overlapping. The overlapping baseboards are shown in red on the MiniMap. | ||
Line 94: | Line 93: | ||
*You can move the centre of focus, the centre of the MiniMap view, by moving the mouse pointer to a new position and clicking with the right button. | *You can move the centre of focus, the centre of the MiniMap view, by moving the mouse pointer to a new position and clicking with the right button. | ||
− | *The four arrows shown at the top, bottom and both sides of the map display can be clicked to move the '''''merged route''''' in the direction shown by each arrow | + | *The four arrows shown at the top, bottom and both sides of the map display can be clicked to move the '''''merged route''''' in the direction shown by each arrow. |
</td> | </td> | ||
</tr> | </tr> |
Revision as of 09:35, 5 July 2018
Contents |
Merging Routes
The Surveyor Merge Routes command allows two different routes to be joined together - edge to edge. |
Before You Start Merging
Make sure that you have backup copies of all the routes that you are going to merge. |
Before you start merging there are some important points you will need to consider and there may be some preparation work that will have to be performed.
Identify
- the route that will be the base route. This route will form the backbone of the combined routes. This will usually be the larger route or the route that contains Session data that you want to keep in the merge.
- the route that will be the merged route. This route will be joined to the base route.
- the orientation (North-South or East-West) of the routes to be merged. Are they the same or different?
- the baseboards in each route where they will be joined.
- the height of the baseboards in both route at the merge point. Are they exactly the same height?
Common Problems
Most route mergers will have problems but most of those problems can be easily fixed. |
Some problems will require you to do a bit (or a lot) of extra work before you can merge two routes into one. But for some problems, the best solution may be to select other routes to merge.
Selecting and Loading the Routes to Merge
- Load the Base Route into Surveyor
- Should you load the Route or the Session?
- The answer depends on whether or not the Session contains assets (scenery, consists) and settings (rules, driver commands, industry and wagon loads, weather, time of day, etc) that you want to continue to use in the new merged Route and its Session. If the Session contains nothing that you need then load the Route only into Surveyor. Note that when you add the merged route its Route assets and data will be loaded but not its Session assets or data.
- Should you load the Route or the Session?
This will merge the two routes and display a "minimap" of the new combined routes with some control options.
The Merge Map
|
Move the Merged Route into its New Position
Click on the direction arrows shown at the top, bottom and sides of the MiniMap window to move the merged route into its correct position. Each click will move the merged route one baseboard in the selected direction.
In the example shown on the left, clicking the Left arrow 5 times moved the merged route 5 baseboards to the left so that there was no overlapping baseboards and all terrain conflicts were resolved.
|