Quorn Shunter |
Shunting operations around Quorn yard. |
|
|
Each location in the layout has a detailed set of track diagrams that provide the following information:- |
|
- the names of the tracks, sidings and loops
- the location of various facilities - stations, turntables, water columns, coal stages, engine sheds, active industries
- the names of active industries and their products and consumables
- the names and locations of trackmarks for Drive To and Drive Via commands
- the names, properties and locations of track switches and lists of switch sets for particular movements
- Enhanced Interlocking Tower paths for those locations that have EITs
|
|
To display the location data click the graphic here or in the text below, or go to the bottom of the page for all the session links (links will open in this window). |
|
Duration: |
40 minutes |
Loco: |
SAR T 51 at Quorn Depot
Other Unrostered Locos:
|
|
Tasks:
- Move the loco from the depot and onto the Fuel Depot Siding
- Collect the 4 empty Tank wagons stored in the siding and move them to eastern (Peterborough) end of the Station road.
- Collect the 8 wagons Tank wagons and DB guard van stored in the Goods Sidings
- Attach the 8 wagons and van to the western (Port Augusta) end of the 4 wagons on the Station road so that the DB van is at the rear (Port Augusta) end.
- You can either:-
- Terminate the scenario by moving the wagons to storage on Siding 1 and the loco back to the depot, OR
- Begin the Quorn-Peterborough Empty Fuel Freight sceneraio starting at Step 5 (you have already completed the first 4 steps).
|
Driving Notes:
- You have permission to pass semaphore signals at stop provided you are satisfied that the road ahead is clear.
|
This page was created by Trainz user pware in February 2021 and was last updated as shown below.