SAR Scenario Gladstone Shunter
From TrainzOnline
Gladstone Shunter | |
Shunting operations in Gladstone Yard and nearby sidings. |
Duration: | 40 minutes | ||
Loco: | SAR T 210 at Gladstone Depot Other Unrostered Locos: none |
||
|
|||
Tasks:
|
|||
Driving Notes:
|
Links: All links will open in this window | ||||
Session Scenarios List |
Location List |
Rolling Stock |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.