SAR Peterborough
m |
m |
||
Line 106: | Line 106: | ||
The '''Port Pirie-Broken Hill Line''' was converted to standard gauge (4ft8.5in) during 1969-1970 and the '''Peterborough-Terowie Line''' was converted to dual gauge by the addition of broad gauge (5ft3in) in 1970. The '''Peterborough-Quorn Line''' was left as an isolated narrow gauge line making Peterborough a triple gauge location until the eventual closure of the two non-standard gauge lines.<br> | The '''Port Pirie-Broken Hill Line''' was converted to standard gauge (4ft8.5in) during 1969-1970 and the '''Peterborough-Terowie Line''' was converted to dual gauge by the addition of broad gauge (5ft3in) in 1970. The '''Peterborough-Quorn Line''' was left as an isolated narrow gauge line making Peterborough a triple gauge location until the eventual closure of the two non-standard gauge lines.<br> | ||
− | '''Peterborough''' is now just a passing loop. The main loco depot has been taken over by the '''Steamtown Railway Preservation Society''' as a static museum and most other facilities have been removed. The railway station has been retained and until a few years ago was serviced by the luxury '''Indian-Pacific''' passenger train running between '''Sydney''', '''Adelaide''' and '''Perth'''. In the current timetable, the service no longer stops at '''Peterborough'''. | + | '''Peterborough''' is now just a passing loop. The main loco depot has been taken over by the '''Steamtown Peterborough Railway Preservation Society''' as a static museum and most other facilities have been removed. The railway station has been retained and until a few years ago was serviced by the luxury '''Indian-Pacific''' passenger train running between '''Sydney''', '''Adelaide''' and '''Perth'''. In the current timetable, the service no longer stops at '''Peterborough'''. |
</td> | </td> | ||
</tr> | </tr> |
Revision as of 15:45, 29 April 2022
|