SAR Scenario Peterborough Shunter
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 112: | Line 112: | ||
# Shunt the loaded wagons to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 3 </span> and stable. | # Shunt the loaded wagons to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 3 </span> and stable. | ||
# Move the loco to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 5 </span> and attach to the rake of empty '''Livestock''' wagons stored there. | # Move the loco to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 5 </span> and attach to the rake of empty '''Livestock''' wagons stored there. | ||
− | # Shunt the empty wagons to the <span style="font-weight: 700; color: white; background-color: red;"> Stockyard Siding </span> at the far end of the <span style="font-weight: 700; color: white; background-color: red;"> Stockyard </span> road for pickup by | + | # Shunt the empty wagons to the <span style="font-weight: 700; color: white; background-color: red;"> Stockyard Siding </span> at the far end of the <span style="font-weight: 700; color: white; background-color: red;"> Stockyard </span> road for pickup by another service. |
# Move the loco back into the main depot to the <span style="font-weight: 700; color: white; background-color: black;"> Loco Depot Sidings </span> next to the tall water tower. There are empty coal ('''CCC''') and fuel ('''Tanker''') wagons stored on two of the siding roads. | # Move the loco back into the main depot to the <span style="font-weight: 700; color: white; background-color: black;"> Loco Depot Sidings </span> next to the tall water tower. There are empty coal ('''CCC''') and fuel ('''Tanker''') wagons stored on two of the siding roads. | ||
− | # Shunt the two wagon sets into a single consist and stable on one of the empty <span style="font-weight: 700; color: white; background-color: black;"> Loco Depot Sidings </span> roads for | + | # Shunt the two wagon sets into a single consist and stable on one of the empty <span style="font-weight: 700; color: white; background-color: black;"> Loco Depot Sidings </span> roads for pickup by another service. |
# Move the loco to the back of the workshop area at the end of the <span style="font-weight: 700;"> Depot <span style="color: white; background-color: black;"> Repair Storage Road </span></span>. | # Move the loco to the back of the workshop area at the end of the <span style="font-weight: 700;"> Depot <span style="color: white; background-color: black;"> Repair Storage Road </span></span>. | ||
− | # Attach to loco '''SAR T 229''' (not in steam) and move it into the repair shop on <span style="font-weight: 700;"> Depot <span style="color: white; background-color: black;"> Repair Shop Road </span> 2</span> or '''3'''. Detach the loco. | + | # Attach to loco '''SAR T 229''' (not in steam) and move it dead attached into the repair shop on <span style="font-weight: 700;"> Depot <span style="color: white; background-color: black;"> Repair Shop Road </span> 2</span> or '''3'''. Detach the loco. |
# Return the loco to its starting position on <span style="font-weight: 700;"> Depot <span style="color: white; background-color: black;"> Shed Road </span> 1</span>. | # Return the loco to its starting position on <span style="font-weight: 700;"> Depot <span style="color: white; background-color: black;"> Shed Road </span> 1</span>. | ||
</td> | </td> |
Revision as of 06:54, 14 November 2021
12 Peterborough Shunter | ||
A scenario in the SAR Peterborough Base Session |
Shunting operations that cover the length of Peterborough Yard and Peterborough Depot. |
|
Tutorial:
|
|
|
Links: All links will open in this window | ||||||||
Session Scenarios |
Location List |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.