SAR Scenario Peterborough Shunter
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 81: | Line 81: | ||
<td><span style="font-size: 15px; font-weight: 700;">Tasks:</span> | <td><span style="font-size: 15px; font-weight: 700;">Tasks:</span> | ||
# Move the loco out of the <span style="font-weight: 700;"><span style="color: white; background-color: black;"> Loco </span> Depot</span> and navigate through to the other side of '''Peterborough Yard''' onto the <span style="font-weight: 700; color: white; background-color: red;"> Stockyard </span> road. | # Move the loco out of the <span style="font-weight: 700;"><span style="color: white; background-color: black;"> Loco </span> Depot</span> and navigate through to the other side of '''Peterborough Yard''' onto the <span style="font-weight: 700; color: white; background-color: red;"> Stockyard </span> road. | ||
− | # Reverse onto <span style="color: black; background-color: yellow | + | # Reverse onto <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 4 </span> and attach to the rake of empty '''MTW''' flat wagons stored there. |
− | # Move the empty wagons to the <span style="color: black; background-color: yellow | + | # Move the empty wagons to the <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Crane </span> and load. |
− | # Shunt the loaded wagons to <span style="color: black; background-color: yellow | + | # Shunt the loaded wagons to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 3 </span> and stable. |
− | # Move the loco to <span style="color: black; background-color: yellow | + | # Move the loco to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 5 </span> and attach to the rake of empty '''Livestock''' wagons stored there. |
− | # Shunt the empty wagons to the <span style="color: white; background-color: red | + | # Shunt the empty wagons to the <span style="font-weight: 700; color: white; background-color: red;"> Stockyard Siding </span> at the far end of the <span style="font-weight: 700; color: white; background-color: red;"> Stockyard </span> road for pickup by a later service. |
# Move the loco back into the main depot to the <span style="font-weight: 700; color: white; background-color: black;"> Loco Depot Sidings </span> next to the tall water tower. There are empty coal ('''CCC''') and fuel ('''Tanker''') wagons stored on two of the siding roads. | # Move the loco back into the main depot to the <span style="font-weight: 700; color: white; background-color: black;"> Loco Depot Sidings </span> next to the tall water tower. There are empty coal ('''CCC''') and fuel ('''Tanker''') wagons stored on two of the siding roads. | ||
# Shunt the two wagon sets into a single consist and stable on one of the empty <span style="font-weight: 700; color: white; background-color: black;"> Loco Depot Sidings </span> roads for later pickup and return to '''Port Pirie'''. | # Shunt the two wagon sets into a single consist and stable on one of the empty <span style="font-weight: 700; color: white; background-color: black;"> Loco Depot Sidings </span> roads for later pickup and return to '''Port Pirie'''. |
Revision as of 16:36, 26 February 2021
Peterborough Shunter | |
Shunting operations that cover the length of Peterborough Yard and Peterborough Depot. |
Duration: | 1 hour | ||
Loco: | SAR T 233 on Peterborough Depot Shed Road 1 Other Unrostered Locos:
| ||
|
Yard Map: | ||
Tasks:
|
||
|
Links: All links will open in this window | ||||
Session Scenarios List |
Location List |
Rolling Stock |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.