SAR Peterborough Base Session V1
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 8: | Line 8: | ||
</tr> | </tr> | ||
<tr valign="top"> | <tr valign="top"> | ||
− | <td>'''Links:''' (all links will open in this window)</td> | + | <td width=500>'''Links:''' (all links will open in this window)</td> |
+ | <td width=500 align="right">'''For the latest (V2) version of these scenarios, click <span style="background-color: yellow;"> [[SAR Peterborough Base Session V2|here]] </span></td> | ||
</tr> | </tr> | ||
</table> | </table> | ||
Line 32: | Line 33: | ||
<td bgcolor="lightyellow">'''3 hrs'''</td> | <td bgcolor="lightyellow">'''3 hrs'''</td> | ||
<td bgcolor="white"> </td> | <td bgcolor="white"> </td> | ||
− | <td bgcolor="lightcyan"><span style="font-weight: 700; | + | <td bgcolor="white"> |
+ | <table> | ||
+ | <tr valign="top"> | ||
+ | <td bgcolor="lightcyan"><span style="font-weight: 700; background-color: black; color: yellow;"> 4 </span> </td> | ||
+ | <td bgcolor="lightcyan"><span style="font-weight: 700;">[[SAR Scenario Gladstone-Terowie Passenger V1|Gladstone-Jamestown and Terowie Passenger]]</span></td> | ||
+ | </tr> | ||
+ | </table> | ||
+ | </td> | ||
<td bgcolor="lightyellow">'''35 min to Jamestown'''<br>'''1 hr 40 mins to Terowie'''</td> | <td bgcolor="lightyellow">'''35 min to Jamestown'''<br>'''1 hr 40 mins to Terowie'''</td> | ||
</tr> | </tr> | ||
Line 43: | Line 51: | ||
</tr> | </tr> | ||
<tr valign="top"> | <tr valign="top"> | ||
− | <td bgcolor="lightcyan"><span style="font-weight: 700;"><span style="background-color: black; color: yellow;"> 7 </span> [[SAR Scenario | + | <td bgcolor="lightcyan"><span style="font-weight: 700;"><span style="background-color: black; color: yellow;"> 7 </span> [[SAR Scenario Peterborough-Quorn Local Freight V1|Quorn-Peterborough Local Freight]]</span></td> |
<td bgcolor="lightyellow">'''3 hrs 30 min'''</td> | <td bgcolor="lightyellow">'''3 hrs 30 min'''</td> | ||
<td bgcolor="white"> </td> | <td bgcolor="white"> </td> |
Revision as of 21:53, 24 April 2024
A set of scenarios to use with the SAR Peterborough Narrow Gauge Division layout for TRS19. The scenarios replicate, as far as possible, some of the operations that existed in the division from the 1920s until 1988 but most are set in the late 1960s. All rolling stock, industry and other settings are provided in the session. There are no AI controlled trains other than those you add yourself.
SAR Peterborough Division Scenarios | |
Links: (all links will open in this window) | For the latest (V2) version of these scenarios, click here |
Name | Run Time (approx) | Name | Run Time (approx) |
1 Gladstone-Peterborough Depot Fuel | 2 hrs | 2 Vintage East-West Passenger Express | 3 hrs | |||
3 Gladstone-Wilmington Local Freight | 3 hrs |
|
35 min to Jamestown 1 hr 40 mins to Terowie |
|||
5 Paratoo-Gladstone Bulk Ore | 1 hr 25 min to Peterborough 2 hrs 45 mins to Gladstone |
6 Gladstone-Paratoo Empty Ore | 1 hr 25 min to Peterborough 2 hrs 45 mins to Paratoo |
|||
7 Quorn-Peterborough Local Freight | 3 hrs 30 min | 8 Quorn-Peterborough Empty Fuel | 3 hrs | |||
9 Peterborough-Paratoo Mixed Service | 1 hr 40 min | 10 Paratoo-Gladstone/Terowie Express Freight | 2 hrs 15 min to Terowie 3 hrs to Gladstone |
|||
11 Orroroo Grain Run | 2 hrs 30 min | 12 Peterborough Shunter | 1 hr | |||
13 Gladstone Shunter | 40 min | 14 Terowie Shunter | 50 min | |||
15 Quorn Shunter | 40 min |
Tutorial:
|
|
Links: (all links will open in this window) | |||||||
Location Index |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in January 2021 and was last updated as shown below.