SAR Scenario Peterborough Dieselisation
m |
m |
||
Line 28: | Line 28: | ||
The '''Working Timetable''' for the 1970s and 80s saw only two narrow gauge return freight services each week. One to '''Quorn''' and one to '''Orroroo''' (if required). In addition there were seasonal grain collection services to '''Quorn''' (when required) and to '''Orroroo'''.<br> | The '''Working Timetable''' for the 1970s and 80s saw only two narrow gauge return freight services each week. One to '''Quorn''' and one to '''Orroroo''' (if required). In addition there were seasonal grain collection services to '''Quorn''' (when required) and to '''Orroroo'''.<br> | ||
− | The '''Quorn''' service often terminated at '''Carrieton''' due to the lack of goods to transport. | + | The '''Quorn''' freight service often terminated at '''Carrieton''' due to the lack of goods to transport. If it extended to '''Quorn''' then it also required a crew change on the return trip at '''Bruce''' or '''Hammond'''. The relief crew were transported from '''Peterborough''' by a rail inspection car (see the scenario '''[[SAR Scenario Rail Car Inspection Run|Rail Car Inspection Run]]''') with the relieved crew transported back by the same vehicle.<br> |
In March 1987 the line from '''Eurelia''' to '''Quorn''' was closed. This was followed in November 1988 by the closure of the remaining line from '''Peterborough''' to '''Eurelia''' to regular services. The last scheduled revenue runs on the line were to remove grain from the silos at '''Orroroo''' in October 1988 (see the scenario '''[[SAR Scenario Orroroo Grain|Orroroo Grain Run]]'''). Special excrusion trains from the '''Steamtown Peterborough Railway Preservation Society''' continued to use the line from '''Peterborough''' to '''Eurelia''' until 2002. Most of the line has since been removed.</td> | In March 1987 the line from '''Eurelia''' to '''Quorn''' was closed. This was followed in November 1988 by the closure of the remaining line from '''Peterborough''' to '''Eurelia''' to regular services. The last scheduled revenue runs on the line were to remove grain from the silos at '''Orroroo''' in October 1988 (see the scenario '''[[SAR Scenario Orroroo Grain|Orroroo Grain Run]]'''). Special excrusion trains from the '''Steamtown Peterborough Railway Preservation Society''' continued to use the line from '''Peterborough''' to '''Eurelia''' until 2002. Most of the line has since been removed.</td> | ||
Line 71: | Line 71: | ||
<tr valign="top"> | <tr valign="top"> | ||
<td><span style="font-size: 15px; font-weight: 700; color: white; background-color: black;"> Consist: </span></td> | <td><span style="font-size: 15px; font-weight: 700; color: white; background-color: black;"> Consist: </span></td> | ||
− | <td> | + | <td>The consist for the freight runs (trains '''D3''' and '''D9''') is stored on <span style="font-weight: 700;">Peterborough <span style="background-color: cyan;"> Yard 3 </span></span>. The consist for the grain runs (trains '''D1''' and '''D7''') is at the <span style="font-weight: 700;">Peterborough <span style="background-color: tan;"> Grain Siding </span></span>. To be attached to the selected loco:-</td> |
</tr> | </tr> | ||
<tr valign="top"> | <tr valign="top"> | ||
Line 89: | Line 89: | ||
</tr> | </tr> | ||
</table> | </table> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</td> | </td> | ||
</tr> | </tr> | ||
Line 172: | Line 163: | ||
# Move the selected loco out of the depot and into the yard | # Move the selected loco out of the depot and into the yard | ||
# The consist waiting on the <span style="font-weight: 700;">Peterborough <span style="background-color: cyan;"> Yard 3 </span> Road</span> is in '''three''' parts:- | # The consist waiting on the <span style="font-weight: 700;">Peterborough <span style="background-color: cyan;"> Yard 3 </span> Road</span> is in '''three''' parts:- | ||
− | #* For ''' | + | #* For train '''D9''' select the first 4 wagons only. Shunt these wagons to an empty <span style="font-weight: 700;"><span style="background-color: cyan;"> Yard </span> Road</span>. Attach a '''Guard Van''' to the rear of the consist. The '''Guard Van''' can be taken from the rear of the remaining wagons or from the nearby <span style="font-weight: 700; color: white; background-color: black;"> Car Shed </span> |
− | #* For ''' | + | #* For train '''D3''', if terminating at '''Carrieton''', shunt to combine the first two consists into a single consist. Shunt these wagons to an empty <span style="font-weight: 700;"><span style="background-color: cyan;"> Yard </span> Road</span>. Attach a '''Guard Van''' to the rear of the consist. |
− | #* For ''' | + | #* For train '''D3''' continuing through to '''Quorn''', shunt all three consists into a single consist with the '''Guard Van''' at the rear |
+ | #* For trains '''D1''' and '''D5''' collect the empty grain wagons waiting on the Flour Mill Siding and shunt them to the main yard. Attach a guard van to the rear of the consist | ||
# Proceed onto the <span style="font-weight: 700; color: white; background-color: black;"> Peterborough-Quorn Line </span> | # Proceed onto the <span style="font-weight: 700; color: white; background-color: black;"> Peterborough-Quorn Line </span> | ||
− | # Detach and shunt wagons at each location according to the '''working timetable''' shown below. | + | # Detach and shunt wagons at each location according to the '''working timetable''' shown below. Where multiple drop offs are required all wagons have been named with their destination and placed in the consist in destination order from the front |
# Detach:- | # Detach:- | ||
#* '''MTW''' flat wagons to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Cranes </span> | #* '''MTW''' flat wagons to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Cranes </span> | ||
#* '''QLX''' wagons to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Sheds </span> | #* '''QLX''' wagons to <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Sheds </span> | ||
+ | #* '''WTE''' wagons to <span style="font-weight: 700; color: black; background-color: tan;"> Grain Silos </span> | ||
# Leave each wagon at its loading/unloading point | # Leave each wagon at its loading/unloading point | ||
− | # For ''' | + | # For trains '''D7''' and '''D9''' turn the loco on the <span style="font-weight: 700; color: white; background-color: black;"> WYE </span> at '''Orroroo''' |
− | #:'''Note:''' The <span style="font-weight: 700; color: white; background-color: black;"> WYE </span> was actually removed in the 1930s so in reality the loco would have to run "long nose first" back to '''Peterborough''' (or "long nose first" up to '''Orroroo'''). As '''SAR 858''' was the only narrow gauge loco based at '''Peterborough''' from 1973, this problem could not be solved by double-heading with another locomotive, but | + | #:'''Note:''' The <span style="font-weight: 700; color: white; background-color: black;"> WYE </span> was actually removed in the 1930s so in reality the loco would have to run "long nose first" back to '''Peterborough''' (or "long nose first" up to '''Orroroo'''). As '''SAR 858''' was the only narrow gauge loco based at '''Peterborough''' from 1973, this problem could not be solved by double-heading with another locomotive, but double heading is still an option in this scenario |
− | # For ''' | + | # For train '''D3''' you may take the option to terminate at '''Carrieton''' |
</td> | </td> | ||
<td width=100>[[image:SAR Train Order Rotated.png|100px|link=|alt=Logo]]</td> | <td width=100>[[image:SAR Train Order Rotated.png|100px|link=|alt=Logo]]</td> |
Revision as of 10:45, 19 January 2024
24 Peterborough Dieselisation | ||
A scenario in the SAR Peterborough Base Session v2.0 |
Diesel services on the Peterborough-Quorn Line in the 1970s and 80s. |
The Historical Bit
By 1970 the main Port Pirie-Broken Hill Line had been converted to standard gauge (4ft 8½in - 1435mm) which isolated the Peterborough-Quorn Line from the rest of the narrow gauge network.
1970 also saw the removal of steam from Peterborough and all remaining narrow gauge services were operated by SAR 830 class narrow gauge diesels, initially SAR 858, 865, 866 and 867 which were based at Peterborough. By the end of 1970 SAR 865 and 866 were transferred to Gladstone and in 1973 SAR 867 was converted, by bogie exchange, to broad gauge (5ft 3in - 1600mm). This left SAR 858 as the only narrow gauge loco at Peterborough from 1973 to 1988. The Working Timetable for the 1970s and 80s saw only two narrow gauge return freight services each week. One to Quorn and one to Orroroo (if required). In addition there were seasonal grain collection services to Quorn (when required) and to Orroroo. The Quorn freight service often terminated at Carrieton due to the lack of goods to transport. If it extended to Quorn then it also required a crew change on the return trip at Bruce or Hammond. The relief crew were transported from Peterborough by a rail inspection car (see the scenario Rail Car Inspection Run) with the relieved crew transported back by the same vehicle. |
|
Tutorial:
|
|
|
Driving Notes:
|
Links: All links will open in this window | ||||||||
Session Scenarios |
Location List |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in October 2022 and was last updated as shown below.