SAR Scenario Gladstone Bulk Ore
m |
m |
||
Line 60: | Line 60: | ||
</td> | </td> | ||
</tr> | </tr> | ||
− | < | + | </table> <!-- END Loco/consist sub table --> |
− | <td | + | </td> |
− | <table bgcolor="lightcyan"> <!-- BEGIN Location Data table --> | + | </tr> |
+ | </table> <!-- END Scenario image and loco/consist table --> | ||
+ | <table bgcolor="lightcyan" width=1000> <!-- BEGIN Location Data table --> | ||
<tr> | <tr> | ||
<td>[[Image:Location Index.png|link=SAR Index|alt=Location Index|Location Index]]</td> | <td>[[Image:Location Index.png|link=SAR Index|alt=Location Index|Location Index]]</td> | ||
Line 70: | Line 72: | ||
</tr> | </tr> | ||
</table> <!-- END Location Data table --> | </table> <!-- END Location Data table --> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<table cellpadding="2" bgcolor="black" width=1000> <!-- BEGIN Black border for Getting Started table --> | <table cellpadding="2" bgcolor="black" width=1000> <!-- BEGIN Black border for Getting Started table --> | ||
<tr valign="top"> | <tr valign="top"> |
Revision as of 17:31, 23 August 2022
5 Paratoo to Peterborough Bulk Ore Paratoo to Gladstone Bulk Ore |
||
A scenario in the SAR Peterborough Base Session |
Express bulk ore freight from Broken Hill to Port Pirie. |
The Historical Bit
The line from Port Pirie to Cockburn on the South Australia - New South Wales border was built in stages from 1875 to 1888 largely to capture the lead, zinc and silver ore traffic from the mines at Broken Hill just over the border in New South Wales. Because the SAR was not allowed to operate into New South Wales, a private railway, the Silverton Tramway, was created to carry the ore across the border. The SAR and Silverton Tramway simply swapped locos at Cockburn on the border. It was called a "tramway" to get around a NSW law banning private railways but not private tramways. Despite the title it was a fully operating heavy haul railway, and one of the most profitable in the country.
The SAR had a monopoly on the ore traffic until 1919 when the NSWGR (New South Wales Government Railways) completed its own standard gauge (4ft 8.5in) line from Sydney to Broken Hill but the SAR continued to carry the bulk of the ore because the port and smelter at Port Pirie was much closer to Broken Hill.
By 1970 the narrow gauge line from Port Pirie to Broken Hill had been converted to standard gauge and the Silverton Tramway ceased its ore hauling operations but continues to operate today providing standard gauge shunting services and leases locos to rail operators.
|
Tutorial:
|
|
|
Links: All links will open in this window | ||||||||
Session Scenarios |
Location List |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.