SAR Scenario Wilmington Freight
m |
m |
||
Line 140: | Line 140: | ||
*Trackmarks and industries have been provided for AI '''Drive To Trackmark''', '''Drive via Trackmark''' and '''Drive to <span style="background-color: yellow;"> Industry </span>''' commands. Click [[image:Line_Index_Label.png|link=SAR_Index|Location Index]] for details. | *Trackmarks and industries have been provided for AI '''Drive To Trackmark''', '''Drive via Trackmark''' and '''Drive to <span style="background-color: yellow;"> Industry </span>''' commands. Click [[image:Line_Index_Label.png|link=SAR_Index|Location Index]] for details. | ||
*Manual (no AI) driving is possible. As a visual driving aid, a '''Caution''' warning sign has been placed at the location of the '''Main Approach Dn''' and '''Main Approach Up''' trackmarks. Click [[image:Line_Index_Label.png|link=SAR_Index|Location Index]] for details. | *Manual (no AI) driving is possible. As a visual driving aid, a '''Caution''' warning sign has been placed at the location of the '''Main Approach Dn''' and '''Main Approach Up''' trackmarks. Click [[image:Line_Index_Label.png|link=SAR_Index|Location Index]] for details. | ||
+ | *If driving manually in yards, you are responsible for correctly setting any '''catch points'''. | ||
</td> | </td> | ||
</tr> | </tr> |
Revision as of 11:33, 6 June 2022
3 Gladstone to Wilmington Local Freight | ||
A scenario in the SAR Peterborough Base Session |
A twice weekly (if required) freight service from Gladstone to Wilmington dropping wagons at locations as required. |
The Historical Bit
By the 1960s the Wilmington Line was in decline. Scheduled freight services were often cancelled due to insufficient loads and passenger services sometimes consisted of a passenger car attached to a freight service.
When the Port Pirie-Broken Hill Line was converted to standard gauge in 1969-70 the Wilmington Line became isolated from the rest of the narrow gauge network. This resulted in the cancellation of all passenger services on the line.
The line had no signals beyond Gladstone Yard and only Booleroo Centre was manned by railway staff. Train order working was in operation on the line.
The 1980s working timetable for the Wilmington Line consisted of a single return freight service each week. The line was closed in 1990 and the track has since been removed. A section of the line has been converted to a "rail trail".
|
Tutorial:
|
|
|
Links: All links will open in this window | ||||||||
Session Scenarios |
Location List |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.