SAR Scenario East-West Express
m |
m |
||
Line 115: | Line 115: | ||
<tr valign="top"> | <tr valign="top"> | ||
<td> | <td> | ||
− | <table bgcolor= | + | <table bgcolor=#f5f5f5 width=820> <!-- BEGIN Tasks Table --> |
<tr valign="top"> | <tr valign="top"> | ||
<td> | <td> | ||
− | <span style="font-size: 15px; font-weight: 700; color: white; background-color: black;"> Tasks: </span><br> | + | <table width=820> <!-- BEGIN Logo and orders table --> |
+ | <tr valign="top"> | ||
+ | <td width=720><span style="font-size: 15px; font-weight: 700; color: white; background-color: black;"> Tasks: </span><br> | ||
# Shunt the train into the narrow gauge platform at <span style="font-weight: 700;">Terowie <span style="color: black; background-color: white;"> Station </span></span>. | # Shunt the train into the narrow gauge platform at <span style="font-weight: 700;">Terowie <span style="color: black; background-color: white;"> Station </span></span>. | ||
− | # Proceed according to the timetable. | + | # Proceed to '''Quorn''' according to the timetable. |
+ | # At '''Quorn''' detach the loco and proceed to the <span style="font-weight: 700;"><span style="color: white; background-color: black;"> Loco </span> Depot</span>. A '''CR''' loco and crew will take the train to '''Port Augusta'''. | ||
+ | # Coal and water the loco and stable in the shed. | ||
</td> | </td> | ||
</tr> | </tr> | ||
Line 177: | Line 181: | ||
</td> | </td> | ||
</tr> | </tr> | ||
− | </table> <!-- Timetable black border --> | + | </table> <!-- END Timetable black border --> |
− | '''Terowie''', '''Peterborough''' and '''Quorn''' are industry active stations and may have a longer than normal loading time, so patience will be needed.< | + | '''Terowie''', '''Peterborough''' and '''Quorn''' are industry active stations and may have a longer than normal loading time, so patience will be needed. |
+ | </td> | ||
+ | <td width=100>[[image:SAR Train Order Rotated.png|100px|link=|alt=Logo]]</td> | ||
+ | </tr> | ||
+ | </table> <!-- END Logo and orders table --> | ||
</td> | </td> | ||
</tr> | </tr> | ||
</table> <!-- END Tasks Table --> | </table> <!-- END Tasks Table --> | ||
+ | |||
<table cellpadding="2" bgcolor="black" width=820> <!-- BEGIN Black border for Driving Notes sub table --> | <table cellpadding="2" bgcolor="black" width=820> <!-- BEGIN Black border for Driving Notes sub table --> | ||
<tr valign="top"> | <tr valign="top"> |
Revision as of 19:23, 13 November 2021
2 Vintage East-West Express: Terowie to Port Augusta Passenger | ||
A scenario in the SAR Peterborough Base Session |
A limited stop passenger service from Terowie to Quorn. |
The Historical Bit
From 1917 to 1932 the Terowie-Peterborough-Quorn Line was a vital part of the Transcontinental Railway between Sydney, NSW on the east coast and Perth, WA on the west coast.
The South Australian Railways provided an express passenger service, the East-West Express, that ran between Terowie and Port Augusta via Quorn. The name "East-West" came from its role in connecting the eastern side of the continent to the western side - in reality the service ran mostly North-South.
At Terowie it connected with broad gauge services from Adelaide and Melbourne. At Peterborough it connected with narrow gauge services from Broken Hill where there was a standard gauge connection from Sydney. At Quorn it connected with narrow gauge services from the Central Australia Line. At Port Augusta it connected with standard gauge services to Kalgoolie, where there was a narrow gauge connection to Perth.
Passengers making the entire trip from Sydney to Perth would:-
- change trains 5 times - at Parkes NSW, Broken Hill NSW, Peterborough SA, Port Augusta SA and Kalgoolie WA plus take a taxi between two stations in Broken Hill
- change track gauges 3 times - standard gauge to narrow at Broken Hill, narrow gauge back to standard at Port Augusta and standard gauge to narrow at Kalgoolie
- navigate through 5 different rail systems - NSWGR, Silverton Tramway, SAR, Commonwealth Railways and WAGR
The entire journey from coast to coast would take 6 days, if all the connections were made.
In 1932 a more direct broad gauge line from Adelaide to Port Augusta via Port Pirie was completed. The East-West Express then ran as a broad gauge service on that line although an express passenger service continued to run between Terowie and Port Augusta until 1937. In 1970 the narrow and broad gauge lines between Broken Hill, Port Pirie and Port Augusta, and between Kalgoolie and Perth were converted to standard gauge, followed by the later conversion of the broad gauge line from Adelaide to Port Pirie.
Today passengers can board a luxury train, the Indian Pacific, in Sydney and travel the entire distance to Perth via Adelaide in 3 days without leaving the train or changing gauge.
|
Tutorial:
|
|
|
Links: All links will open in this window | ||||||||
Session Scenarios |
Location List |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.