From TrainzOnline
(Difference between revisions)
|
|
Line 80: |
Line 80: |
| # You can either:- | | # You can either:- |
| ## Terminate the scenario by moving the wagons to storage on '''Siding 1''' and the loco back to the depot, '''OR''' | | ## Terminate the scenario by moving the wagons to storage on '''Siding 1''' and the loco back to the depot, '''OR''' |
− | ## Begin the '''Quorn-Peterborough Empty Fuel Freight''' sceneraio starting at '''Step 5''' (you have already completed the first 4 steps).</td> | + | ## Begin the '''Quorn-Peterborough Empty Fuel Freight''' scenario starting at '''Step 5''' (you have already completed the first 4 steps).</td> |
| </tr> | | </tr> |
| <tr valign="top"> | | <tr valign="top"> |
Revision as of 06:41, 23 February 2021
Quorn Shunter |
Shunting operations around Quorn yard. |
|
|
Each location in the layout has a detailed set of track diagrams that provide the following information:- |
|
- the names of the tracks, sidings and loops
- the location of various facilities - stations, turntables, water columns, coal stages, engine sheds, active industries
- the names of active industries and their products and consumables
- the names and locations of trackmarks for Drive To and Drive Via commands
- the names, properties and locations of track switches and lists of switch sets for particular movements
- Enhanced Interlocking Tower paths for those locations that have EITs
|
|
To display the location data click any graphic, or go to the bottom of the page for all the session links (all links will open in this window). |
|
Duration: |
40 minutes |
Loco: |
SAR T 51 at Quorn Depot
Other Unrostered Locos:
|
|
Tasks:
- Move the loco from the depot and onto the Fuel Depot Siding
- Collect the 4 empty Tank wagons stored in the siding and move them to eastern (Peterborough) end of the Station road.
- Collect the 8 wagons Tank wagons and DB guard van stored in the Goods Sidings
- Attach the 8 wagons and van to the western (Port Augusta) end of the 4 wagons on the Station road so that the DB van is at the rear (Port Augusta) end.
- You can either:-
- Terminate the scenario by moving the wagons to storage on Siding 1 and the loco back to the depot, OR
- Begin the Quorn-Peterborough Empty Fuel Freight scenario starting at Step 5 (you have already completed the first 4 steps).
|
|
Driving Notes:
- You have permission to pass semaphore signals at stop provided you are satisfied that the road ahead is clear.
|
This page was created by Trainz user pware in February 2021 and was last updated as shown below.