SAR Scenario Terowie Shunter

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m
Line 35: Line 35:
 
<br>
 
<br>
 
'''Other Links:'''
 
'''Other Links:'''
*'''[[SAR Peterborough Base Session#Locos|Locomotives and Rolling Stock]]''' - commodities carried
+
*'''[[image:Kurandamini.png|link=|alt=Rolling Stock|100px]]&nbsp;[[SAR Peterborough Base Session#Locos|Locomotives and Rolling Stock]]''' - commodities carried
*'''[[SAR Peterborough Base Session#Industries|Active Industries]]''' - commodities produced and consumed
+
*'''[[image:SAR Industries.png|link=|alt=Industries|100px]]&nbsp;[[SAR Peterborough Base Session#Industries|Active Industries]]''' - commodities produced and consumed
 
</td>
 
</td>
 
</tr>
 
</tr>

Revision as of 14:34, 17 February 2021

 Terowie Shunter 

Shunting operations in Terowie Yard.

Shunter
Passenger Return to the Base Session Scenario List


Each location in the layout has a detailed set of track diagrams that provide the following information:-
Location Index
Line Index
  • the names of the tracks, sidings and loops
  • the location of various facilities - stations, turntables, water columns, coal stages, engine sheds, active industries
  • the names of active industries and their products and consumables
  • the names and locations of trackmarks for Drive To and Drive Via commands
  • the names, properties and locations of track switches and lists of switch sets for particular movements
  • Enhanced Interlocking Tower paths for those locations that have EITs
Click Line Index Label.png or the graphic above to access the location data.


Other Links:

Duration: xx minutes
Loco: SAR T 198 at Terowie Depot

Other Unrostered Locos:

  • SAR T 231 at Terowie Depot
Yard map
Task:
  1. Move the loco out of the depot and run tender first past Terowie Station to the Goods Transfer Sidings.
  2. Couple the loco to the rake of MTW flat wagons stored on the northern (Peterborough) end of Siding 2.
  3. Take the MTW flat wagons to the Goods Gantry Narrow Gauge to be loaded.
  4. After loading take the wagons back to the Goods Transfer Sidings and store them on Siding 1.
  5. Couple the loco to the rake of QLX wagons on Siding 2.
  6. Take the QLX wagons to the Goods Transfer Narrow Gauge shed and load.
  7. After loading move the wagons onto Siding 2.
  8. The two rakes of loaded wagons on Siding 1 and Siding 2 must be split and recombined into two consists according to their destinations. The destinations, Peterborough and Gladstone, are shown in the name of each wagon. All the Gladstone wagons are to be placed into one consist and the Peterborough wagons into the other consist.
  9. Combine the two consists into one consist with the Peterborough wagons at the front (Peterborough) end the DB Guard Van at the rear of the Gladstone wagons.
  10. Move the combined consist onto the Loop road in the main Terowie Yard.
  11. Return the loco to its starting position on Terowie Depot.
Driving Notes:
  • You have permission to pass semaphore signals at stop provided you are satisfied that the road ahead is clear.
Top


Personal tools