Talk:SAR Wilmington
From TrainzOnline
Track and interlocking tower paths diagram of Laura on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown as it existed in the early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line. The standard gauge line replaced the narrow gauge line from Port Pirie to Broken Hill making the Wilmington Line an isolated narrow gauge line until it was closed. Wilmington was the terminus of the line. Created to support the TRS19 version layout. Created to support the TRS19 version layout.