SAR Port Pirie-Broken Hill
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 193: | Line 193: | ||
<span style="font-weight: 700; background-color: black; color: white;">Length: </span> 127km (Gladstone to Paratoo) of 390km total length<br><br> | <span style="font-weight: 700; background-color: black; color: white;">Length: </span> 127km (Gladstone to Paratoo) of 390km total length<br><br> | ||
− | Built as a narrow gauge (3'6" - 1067mm) line from '''Port Pirie''' to '''Gladstone''' in 1875, it was extended to '''Cockburn''' on the '''South Australia - New South Wales''' border in stages by 1888. Because the South Australian Railways were not allowed to operate over the border into New South Wales, a private railway, the '''Silverton Tramway''' (which was | + | Built as a narrow gauge (3'6" - 1067mm) line from '''Port Pirie''' to '''Gladstone''' in 1875, it was extended to '''Cockburn''' on the '''South Australia - New South Wales''' border in stages by 1888. Because the South Australian Railways were not allowed to operate over the border into New South Wales, a private railway, the '''Silverton Tramway''' (which was called a "tramway" for legal reasons but it was a fully operating narrow gauge railway), was built to connect the line to the mines at '''Broken Hill'''.<br> |
The main purpose of the line was to transport the mineral ores from the mines at '''Broken Hill''' to the smelters and port at '''Port Pirie''', a function it still performs today.<br> | The main purpose of the line was to transport the mineral ores from the mines at '''Broken Hill''' to the smelters and port at '''Port Pirie''', a function it still performs today.<br> |