Talk:SAR Laura

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
(Created page with "Track and interlocking tower paths diagram of Laura on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown as it existed in th...")
 
m
 
(4 intermediate revisions by one user not shown)
Line 1: Line 1:
Track and interlocking tower paths diagram of Laura on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown as it existed in the early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line. The standard gauge line replaced the narrow gauge line from Port Pirie to Broken Hill making Gladstone a triple gauge junction and the Wilmington Line an isolated narrow gauge line until its was closed. Created to support the TRS19 version layout.
+
Track diagram and other data for Laura on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Wilmington Line became an isolated narrow gauge branch line until it was closed in 1990. Created to support the TRS19 version layout.

Latest revision as of 21:02, 22 July 2022

Track diagram and other data for Laura on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Wilmington Line became an isolated narrow gauge branch line until it was closed in 1990. Created to support the TRS19 version layout.

Personal tools