SAR Port Augusta-Hawker
m |
m |
||
Line 25: | Line 25: | ||
</tr> | </tr> | ||
<tr valign="top"> <!-- Summit Icons --> | <tr valign="top"> <!-- Summit Icons --> | ||
− | <td>& | + | <td> </td> |
</tr> | </tr> | ||
Line 41: | Line 41: | ||
<td align="right"> <!-- Insert "Junction for"/Terminus/Broad Gauge graphics --> | <td align="right"> <!-- Insert "Junction for"/Terminus/Broad Gauge graphics --> | ||
− | <span style="font-weight: 700; color: white;">Junction for</span>& | + | <span style="font-weight: 700; color: white;">Junction for</span> [[Image:PeterboroughLine.png|link=SAR Peterborough-Quorn|alt=Quorn Line|Peterborough-Quorn Line]] |
</td> | </td> | ||
Line 132: | Line 132: | ||
<td>[[image:Water_Icon.png|link=|alt=Water]]</td> | <td>[[image:Water_Icon.png|link=|alt=Water]]</td> | ||
<td>'''Loco Water Tank'''</td> | <td>'''Loco Water Tank'''</td> | ||
− | <td Colspan=2>& | + | <td Colspan=2> </td> |
</tr> | </tr> | ||
<tr valign="top"> | <tr valign="top"> | ||
Line 172: | Line 172: | ||
<td colspan=4> | <td colspan=4> | ||
<span style="font-size: 20px; font-weight: 700;">Line History:</span><br><br> | <span style="font-size: 20px; font-weight: 700;">Line History:</span><br><br> | ||
− | <span style="font-weight: 700; background-color: black; color: white;">Opened:& | + | <span style="font-weight: 700; background-color: black; color: white;">Opened: </span> 1879-1891<br> |
− | <span style="font-weight: 700; background-color: black; color: white;">Length:& | + | <span style="font-weight: 700; background-color: black; color: white;">Length: </span> 81km - 50¼mi ('''Woolshed Flat''' to '''Hawker''' section)<br> |
− | <span style="font-weight: 700; background-color: black; color: white;">Closed (in sections):& | + | <span style="font-weight: 700; background-color: black; color: white;">Closed (in sections): </span> 1956, 1972<br> |
− | <span style="font-weight: 700; background-color: black; color: white;">Reopened (in sections):& | + | <span style="font-weight: 700; background-color: black; color: white;">Reopened (in sections): </span> '''Port Augusta''' to '''Quorn''' 1974-2001 as a Heritage Railway<br> |
− | Built as a narrow gauge (3ft6in - 1067mm) line from '''Port Augusta''' to '''Oodnadatta'''. It reached '''Quorn''' (39km, 24mi) in 1879, '''Marree''' (372km, 231mi) in 1883 and '''Oodnadatta''' (770km, 478mi) in 1891. Originally known as the <span style="color: white; background-color: black; font-weight: 700;">& | + | Built as a narrow gauge (3ft6in - 1067mm) line from '''Port Augusta''' to '''Oodnadatta'''. It reached '''Quorn''' (39km, 24mi) in 1879, '''Marree''' (372km, 231mi) in 1883 and '''Oodnadatta''' (770km, 478mi) in 1891. Originally known as the <span style="color: white; background-color: black; font-weight: 700;"> Northern Line </span>, it was transferred from the '''SAR''' to the '''Commonwealth Railways (CR)''' in January 1911. The '''SAR''' continued to operate the line until 1926 when the '''CR''' took over. In 1926-29 the line was extended to '''Alice Springs''' (1241km, 771mi) near the centre of the continent and then became known as the <span style="color: white; background-color: black; font-weight: 700;"> Central Australia Railway </span>.<br> |
Despite crossing some of the driest parts of the continent the line was often damaged by severe flooding. It was not unusual for trains to be stranded for days by flood waters and track washouts. But even during dry times delays and late running were common. It was often said that a calendar, not a watch, was a better "on time" running guide.<br> | Despite crossing some of the driest parts of the continent the line was often damaged by severe flooding. It was not unusual for trains to be stranded for days by flood waters and track washouts. But even during dry times delays and late running were common. It was often said that a calendar, not a watch, was a better "on time" running guide.<br> | ||
Line 184: | Line 184: | ||
The route of the line in its southern section had more to do with politics than good practice. The route from '''Port Augusta''' to '''Quorn''' took it through the '''Flinders Ranges''' via the '''Pichi Richi Pass''' which required steep grades and tight curves. The route of the northern section was largely dictated by the availability of reliable water sources. In dry periods a water tanker was often added to the consist to provide water for the loco. The line was frequently considered for closure.<br> | The route of the line in its southern section had more to do with politics than good practice. The route from '''Port Augusta''' to '''Quorn''' took it through the '''Flinders Ranges''' via the '''Pichi Richi Pass''' which required steep grades and tight curves. The route of the northern section was largely dictated by the availability of reliable water sources. In dry periods a water tanker was often added to the consist to provide water for the loco. The line was frequently considered for closure.<br> | ||
− | The most famous of the passenger trains on the line was '''The Ghan''', named after the Afghan Camel Drivers who drove the camel trains that preceded the arrival of the railway. This originally ran from '''Port Augusta''' to '''Alice Springs''' | + | The most famous of the passenger trains on the line was '''The Ghan''', named after the Afghan Camel Drivers who drove the camel trains that preceded the arrival of the railway. This train originally ran from '''Port Augusta''' to '''Alice Springs''' and it still runs today as a modern luxury tourist train from '''Adelaide''' to '''Alice Springs''' and on to '''Darwin'''.<br> |
− | In the 1950s a new standard gauge (4ft8½in, 1435mm) line was built from '''Port Augusta''' to '''Marree''' which bypassed the '''Flinders Ranges''', '''Quorn''' and '''Hawker'''. Passengers and freight to '''Oodnadatta''' and '''Alice Springs''' changed trains from standard gauge to narrow gauge at '''Marree | + | In the 1950s a new standard gauge (4ft8½in, 1435mm) line was built from '''Port Augusta''' to '''Marree''' which bypassed the '''Flinders Ranges''', '''Quorn''' and '''Hawker'''. Passengers and freight to '''Oodnadatta''' and '''Alice Springs''' changed trains from standard gauge to narrow gauge at '''Marree'''. <br> |
− | In 1956 the sections of the original narrow gauge line from '''Hawker''' to '''Marree''' and from '''Port Augusta''' to '''Quorn''' were closed leaving the section from '''Quorn''' to '''Hawker''' (the <span style="color: white; background-color: black; font-weight: 700;">& | + | In 1956 the sections of the original narrow gauge line from '''Hawker''' to '''Marree''' and from '''Port Augusta''' to '''Quorn''' were closed leaving the section from '''Quorn''' to '''Hawker''' (the <span style="color: white; background-color: black; font-weight: 700;"> Hawker Line </span>) still operating. Occasional special passenger excursion trains from '''Peterborough''' continued to use the line from '''Quorn''' to '''Summit''' and from '''Quorn''' to '''Hawker''' in the 1960s.<br> |
Prior to the closures, the line between '''Quorn''' and '''Hawker''' saw several through workings each day. After the closures this had been reduced to just two return freight services each week and no passenger services. In the 1960s that was reduced further to just a single weekly return freight service, with an additional service that ran "only if required". It was mineral traffic, ''barytes'' or ''barites'' (''barium sulfate'') ore, that kept the line open after 1956. It was transported 70km by road from the mine to '''Hawker''' and then loaded into rail wagons for the trip to '''Quorn'''. At '''Quorn''' it was crushed and bagged for shipment around the country. Rail transport was used because of the poor condition of the roads between '''Hawker''' and '''Quorn'''.<br> | Prior to the closures, the line between '''Quorn''' and '''Hawker''' saw several through workings each day. After the closures this had been reduced to just two return freight services each week and no passenger services. In the 1960s that was reduced further to just a single weekly return freight service, with an additional service that ran "only if required". It was mineral traffic, ''barytes'' or ''barites'' (''barium sulfate'') ore, that kept the line open after 1956. It was transported 70km by road from the mine to '''Hawker''' and then loaded into rail wagons for the trip to '''Quorn'''. At '''Quorn''' it was crushed and bagged for shipment around the country. Rail transport was used because of the poor condition of the roads between '''Hawker''' and '''Quorn'''.<br> | ||
− | After the 1956 closures, '''Port Augusta''' to '''Quorn''' was serviced by a weekly passenger road bus service and a weekly | + | After the 1956 closures, '''Port Augusta''' to '''Quorn''' was serviced by a weekly passenger road bus service and a weekly road freight service.<br> |
+ | |||
+ | The '''Hawker Line''' was closed in 1972. The 1970s also saw the line to '''Alice Springs''', with its standard and narrow gauge sections, replaced by a new standard gauge line that bypassed '''Marree''', '''Oodnadatta''' and all the flood prone areas. In the early 2000s this line was extended to '''Darwin''', on the northern coast of the continent about 2900km north of '''Port Augusta'''.<br> | ||
The <span style="font-weight: 700;" class="plainlinks">[https://www.pichirichirailway.org.au/ Pichi Richi Railway Preservation Society]</span> was formed in 1972 and was operating steam and heritage diesel trains from '''Quorn''' to '''Summit''' by 1974, and then onto '''Woolshed Flat''' by 1979. The track used to restore the line to '''Woolshed Flat''' was taken from the closed '''Hawker Line'''.<br> | The <span style="font-weight: 700;" class="plainlinks">[https://www.pichirichirailway.org.au/ Pichi Richi Railway Preservation Society]</span> was formed in 1972 and was operating steam and heritage diesel trains from '''Quorn''' to '''Summit''' by 1974, and then onto '''Woolshed Flat''' by 1979. The track used to restore the line to '''Woolshed Flat''' was taken from the closed '''Hawker Line'''.<br> |
Revision as of 20:58, 11 August 2023
|