SAR Port Augusta-Hawker
m |
m |
||
Line 192: | Line 192: | ||
Prior to the closures, the line between '''Quorn''' and '''Hawker''' saw several through workings each day. After the closures this had been reduced to just two return freight services each week and no passenger services. In the 1960s that was reduced further to just a single weekly return freight service, with an additional service that ran "only if required". It was mineral traffic, ''barytes'' or ''barites'' (''barium sulfate'') ore, that kept the line open after 1956. It was transported 70km by road from the mine to '''Hawker''' and then loaded into rail wagons for the trip to '''Quorn'''. At '''Quorn''' it was crushed and bagged for shipment around the country. Rail transport was used because of the poor condition of the roads between '''Hawker''' and '''Quorn'''.<br> | Prior to the closures, the line between '''Quorn''' and '''Hawker''' saw several through workings each day. After the closures this had been reduced to just two return freight services each week and no passenger services. In the 1960s that was reduced further to just a single weekly return freight service, with an additional service that ran "only if required". It was mineral traffic, ''barytes'' or ''barites'' (''barium sulfate'') ore, that kept the line open after 1956. It was transported 70km by road from the mine to '''Hawker''' and then loaded into rail wagons for the trip to '''Quorn'''. At '''Quorn''' it was crushed and bagged for shipment around the country. Rail transport was used because of the poor condition of the roads between '''Hawker''' and '''Quorn'''.<br> | ||
− | Occasionally a special passenger excursion train ran from '''Quorn''' to '''Hawker'''. The | + | After the 1956 closures, '''Port Augusta''' to '''Quorn''' was serviced by a weekly passenger road bus service and a weekly freight road service. Occasionally a special passenger excursion train from '''Peterborough''' ran from '''Quorn''' to '''Hawker'''. The '''Hawker Line''' was closed in 1972.<br> |
The <span style="font-weight: 700;" class="plainlinks">[https://www.pichirichirailway.org.au/ Pichi Richi Railway Preservation Society]</span> was formed in 1972 and was operating steam and heritage diesel trains from '''Quorn''' to '''Summit''' by 1974, and then onto '''Woolshed Flat''' by 1979. The track used to restore the line to '''Woolshed Flat''' was taken from the closed '''Hawker Line'''.<br> | The <span style="font-weight: 700;" class="plainlinks">[https://www.pichirichirailway.org.au/ Pichi Richi Railway Preservation Society]</span> was formed in 1972 and was operating steam and heritage diesel trains from '''Quorn''' to '''Summit''' by 1974, and then onto '''Woolshed Flat''' by 1979. The track used to restore the line to '''Woolshed Flat''' was taken from the closed '''Hawker Line'''.<br> |
Revision as of 15:25, 2 October 2022
|