SAR Port Augusta-Hawker
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 179: | Line 179: | ||
In 1956 the sections of the original narrow gauge line from '''Hawker''' to '''Marree''' and from '''Port Augusta''' to '''Quorn''' were closed leaving the section from '''Quorn''' to '''Hawker''' (the <span style="color: white; background-color: black; font-weight: 700;"> Hawker Line </span>) still operating. Occasional excursion trains from '''Peterborough''' continued to use the line from '''Quorn''' to '''Summit''' in the 1960s. <br> | In 1956 the sections of the original narrow gauge line from '''Hawker''' to '''Marree''' and from '''Port Augusta''' to '''Quorn''' were closed leaving the section from '''Quorn''' to '''Hawker''' (the <span style="color: white; background-color: black; font-weight: 700;"> Hawker Line </span>) still operating. Occasional excursion trains from '''Peterborough''' continued to use the line from '''Quorn''' to '''Summit''' in the 1960s. <br> | ||
− | The '''Hawker Line''' was operated by the '''Commonwealth Railways''' using '''SAR''' locomotives and a mixture of '''CR''' and '''SAR''' rolling stock to run a single return freight service each week. This service was | + | The '''Hawker Line''' was operated by the '''Commonwealth Railways''' using '''SAR''' locomotives and a mixture of '''CR''' and '''SAR''' rolling stock to run a single return freight service each week. This service was important because of the poor condition of the roads in the area. No passenger service was provided. The line was eventually closed in 1972.<br> |
The '''Pichi Richi Railway Preservation Society''' was formed in 1972 and was operating steam and heritage diesel trains from '''Quorn''' to '''Summit''' by 1974, and then onto '''Woolshed Flat''' by 1979.<br> | The '''Pichi Richi Railway Preservation Society''' was formed in 1972 and was operating steam and heritage diesel trains from '''Quorn''' to '''Summit''' by 1974, and then onto '''Woolshed Flat''' by 1979.<br> |