Talk:SAR Gumbowie

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
(Created page with "Track and interlocking tower paths diagram of Gumbowie on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown early 1960s prio...")
 
m
 
(2 intermediate revisions by one user not shown)
Line 1: Line 1:
Track and interlocking tower paths diagram of Gumbowie on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line when this section (Terowie to Peterborough) was converted to Irish broad gauge. Created to support the TRS19 version layout.
+
Track diagram and other data for Gumbowie on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge this section (Terowie to Peterborough) was converted to Irish broad gauge and bypassed Gumbowie. Created to support the TRS19 version layout.

Latest revision as of 11:55, 17 November 2021

Track diagram and other data for Gumbowie on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge this section (Terowie to Peterborough) was converted to Irish broad gauge and bypassed Gumbowie. Created to support the TRS19 version layout.

Personal tools