Talk:SAR Gladstone
From TrainzOnline
(Difference between revisions)
(Created page with "Track and interlocking tower paths diagram of Gladstone on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown as it existed i...") |
m |
||
(One intermediate revision by one user not shown) | |||
Line 1: | Line 1: | ||
− | Track | + | Track diagram and other data for Gladstone on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, Gladstone became a triple gauge location and the Wilmington Line became an isolated narrow gauge branch line. The Wilmington Line and the broad gauge line were closed in 1988. Created to support the TRS19 version layout. |
Latest revision as of 11:37, 17 November 2021
Track diagram and other data for Gladstone on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, Gladstone became a triple gauge location and the Wilmington Line became an isolated narrow gauge branch line. The Wilmington Line and the broad gauge line were closed in 1988. Created to support the TRS19 version layout.