Talk:SAR Yangya
From TrainzOnline
(Difference between revisions)
(Created page with "Track and interlocking tower paths diagram of Yangya on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown as it existed in t...") |
m |
||
(One intermediate revision by one user not shown) | |||
Line 1: | Line 1: | ||
− | Track | + | Track diagram and other data for Yangya on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. The Broken Hill to Port Pirie line was converted to standard gauge in 1969. Created to support the TRS19 version layout. |
Latest revision as of 11:36, 17 November 2021
Track diagram and other data for Yangya on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. The Broken Hill to Port Pirie line was converted to standard gauge in 1969. Created to support the TRS19 version layout.