How to Use Procedural Track

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m (Procedural Track Errors)
m
Line 11: Line 11:
 
<br>
 
<br>
  
Procedural track works just like the standard pre-TANE track (non-procedural track) but provides additional cosmetic features.
+
Procedural track works just like the standard or non-procedural track that was the only type available before T:ANE. However, it provides additional cosmetic features (animated blades, frogs and check rails) to junctions.
  
 
<table>
 
<table>
Line 92: Line 92:
  
 
'''Solution:'''
 
'''Solution:'''
*increase the curve radius
+
*Increase the curve radius
 
</td>
 
</td>
 
</tr>
 
</tr>
Line 105: Line 105:
 
'''Solution:'''
 
'''Solution:'''
 
*adjust the spline heights to create a level junction
 
*adjust the spline heights to create a level junction
 +
<br>
 +
<table cellpadding="4" bgcolor=#ffffb0>
 +
<tr valign="top">
 +
<td>[[file:PencilTips.PNG|link=]]</td>
 +
<td>One trick is to move the approach and depart spline points closer to the junction spline (if possible) to reduce the length of track that has to be made level</td>
 +
</tr>
 +
</table>
 +
 
</td>
 
</td>
 
</tr>
 
</tr>
Line 116: Line 124:
  
 
'''Solution:'''
 
'''Solution:'''
 +
*ignore, or
 
*adjust the placement of the second junction to allow the frogs/check rails to be added to the first junction
 
*adjust the placement of the second junction to allow the frogs/check rails to be added to the first junction
 +
<br>
 +
<table cellpadding="4" bgcolor=#ffffb0>
 +
<tr valign="top">
 +
<td>[[file:NotePad.PNG|link=]]</td>
 +
<td><span style="font-size: 17px; font-weight: 700;">Notes:'''</span><br>
 +
This requirement can make it difficult or even impossible to model yards that have very dense track junction layouts. Ignoring the "problem" mey be the only option here.</td>
 +
</tr>
 +
</table>
 
</td>
 
</td>
 
</tr>
 
</tr>

Revision as of 09:03, 6 June 2021

The information in this Wiki Page applies to TANE, TRS19 and Trainz Plus. This guide covers the use of procedural track in Trainz Surveyor, not how to create procedural track assets.

Contents

What is Procedural Track?

DotPoint.JPG Procedural tracks provide animated switch points plus check rails and frogs at track junctions


Procedural track works just like the standard or non-procedural track that was the only type available before T:ANE. However, it provides additional cosmetic features (animated blades, frogs and check rails) to junctions.

Procedural Track
Procedural-LeftPath.pngProcedural-RightPath.png
Non Procedural Track
Procedural-NoPath.png

The switch blade animation will show in both Driver and Surveyor but in TRS19 Platinum Edition and Trainz Plus the Pause option in Surveyor must be checked OFF (no tick). Procedural-CheckPauseOFF.png

Procedural Track
Procedural-FrogsCheckRails.png
Non Procedural Track
Procedural-NonFrogsCheckRails.png

These features are built into the track asset and do not have to be manually added when laying track.

Laying Procedural Track

DotPoint.JPG The "fall-back" position for procedural track is to act and look like ordinary (non-procedural) track

Procedural tracks are laid down in Surveyor just like any other track. Track junctions are formed in the same way as they are when using non-procedural tracks. The difference is that the additional features (animated switch blades, frogs and check rails) are automatically added when a track junction is correctly formed using procedural tracks.

Faulty (incorrectly formed) procedural track junctions will work perfectly well as non-procedural junctions - they can be switched left and right, and trains will pass over them correctly. But the special features that they have will not appear.

DotPoint.JPG A red track spline circle indicates that the procedural track junction is faulty
Procedural-ErrorRedSpline.png

Faulty procedural track junctions are indicted in Surveyor by:-

  • solid red track splines, or
  • flashing red/white or red/yellow track splines

Procedural Track Errors

Some of the most common causes of red track splines are listed below. But remember, that the presence of a red track spline does not stop the track junction from working correctly as a non procedural track junction.

Incompatible Tracks
Procedural-NonProceduralJunction.png Fault:

One of the tracks used to form the junction is not a procedural track

Solution:

  • ignore, or
  • if possible replace the non procedural track with a procedural track
Curve Too Tight
Procedural-CurveTight.png Fault:

One of the diverging tracks has a curve radius that is too tight

Solution:

  • Increase the curve radius
Track Splines Not Level
Procedural-SplineHeight.png Fault:

The spline points that define the junction are not at the same height

Solution:

  • adjust the spline heights to create a level junction


PencilTips.PNG One trick is to move the approach and depart spline points closer to the junction spline (if possible) to reduce the length of track that has to be made level
Junctions Too Close
Procedural-JunctionsTooClose.png Fault:

A second junction has been added that is too close to the first and there is not enough room for the frogs/check rails to be added to the first junction

Solution:

  • ignore, or
  • adjust the placement of the second junction to allow the frogs/check rails to be added to the first junction


NotePad.PNG Notes:
This requirement can make it difficult or even impossible to model yards that have very dense track junction layouts. Ignoring the "problem" mey be the only option here.


Trainz Wiki

TrainzWiki.png

More Tutorials and Guides to Using Trainz


This page was created by Trainz user pware in June 2021 and was last updated as shown below.


Personal tools