Talk:SAR Stone Hut (Basic)

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m
m
 
(One intermediate revision by one user not shown)
Line 1: Line 1:
Track and switch diagram of Stone Hut on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line when the Wilmington Line became an isolated narrow gauge branch line. Created to support the TRS19 version layout.
+
Track and switch diagram of Stone Hut on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Wilmington Line became an isolated narrow gauge branch line until it was closed in 1988. Created to support the TRS19 version layout.

Latest revision as of 22:44, 14 November 2019

Track and switch diagram of Stone Hut on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Wilmington Line became an isolated narrow gauge branch line until it was closed in 1988. Created to support the TRS19 version layout.

Personal tools