Talk:SAR Moockra (Basic)

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m
m
 
Line 1: Line 1:
Track and switch diagram of Moockra on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. Created to support the TRS19 version layout.
+
Track and switch diagram of Moockra on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. Created to support the TRS19 version layout.

Latest revision as of 12:14, 14 November 2019

Track and switch diagram of Moockra on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. Created to support the TRS19 version layout.

Personal tools