Talk:SAR Wilmington

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m
Line 1: Line 1:
Track and interlocking tower paths diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) as it existed in the early 1960s. When the Broken Hill to Port Pirie line was standardised in 1969, the Wilmington Line became an isolated narrow gauge branch line until it closed in 1990. Wilmington was the terminus of the line. Created to support the TRS19 version layout.
+
Track and interlocking tower paths diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Wilmington Line became an isolated narrow gauge branch line until it was closed in 1988. Wilmington was the terminus of the line. Created to support the TRS19 version layout.

Revision as of 23:04, 14 November 2019

Track and interlocking tower paths diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Wilmington Line became an isolated narrow gauge branch line until it was closed in 1988. Wilmington was the terminus of the line. Created to support the TRS19 version layout.

Personal tools