SAR Scenario Gladstone Shunter

From TrainzOnline
Revision as of 11:10, 19 February 2021 by Pware (Talk | contribs)

Jump to: navigation, search

 Gladstone Shunter 

Shunting operations in Gladstone Yard and nearby sidings.

Shunter
Scenarios SAR Peterborough Base Session Scenarios List
Each location in the layout has a detailed set of track diagrams that provide the following information:-
Location Index
Line Index
  • the names of the tracks, sidings and loops
  • the location of various facilities - stations, turntables, water columns, coal stages, engine sheds, active industries
  • the names of active industries and their products and consumables
  • the names and locations of trackmarks for Drive To and Drive Via commands
  • the names, properties and locations of track switches and lists of switch sets for particular movements
  • Enhanced Interlocking Tower paths for those locations that have EITs
Click Line Index Label.png or the graphic above to access the location data (link will open in this window).


Other Links: (these will open in this window)
Rolling Stock Locomotives and Rolling Stock - commodities carried
Industries Active Industries - commodities produced and consumed

Duration: 40 minutes
Loco: SAR T 210 at Gladstone Depot
Other Unrostered Locos: none

Getting Started:

  1. The first step is to pause the session by pressing the P key.
  2. Next locate your loco. Either:-
    1. Open the Finder (press CTRL-F) and type, in the name field, the name of the loco. For example SAR T 210 (or just T 210 should be enough). Click the tick icon, OR
    2. Open the Driver List (bottom left of the screen) and select the loco from there - click the drivers Eye icon to jump to the loco.
  3. Take a few moments to get your bearings. Use the Line Index Label.png (this link will open in this window) and click on Gladstone to load its location details and track plans. The Tab PH Grey.png tab will give you the EIT Paths that are available if you wish to use them. The Tab TM Grey.png tab will give you the location and names of the invisible Track Marks for Drive To commands. The Tab IN Grey.png tab will show the names and locations of all active industries and their commodities. The Tab SW Grey.png tab will give the names and locations of all junction switches as well as some switch sets you may want to use.
  4. Each location page has a direct link to the next location page, in all directions, so you can explore along the route.
  5. When you are ready to start, reload the Peterborough Base Session page (click the Scenarios button on your current location page) and select this Scenario again or just use the Back button on your browser - whichever is quicker.
  6. Press the P key to start the session.
Tasks:
  1. Move the loco out of the depot and run tender first onto the Wilmington Line to the Gladstone Army Stores Junction about 1/3rd of a mile up the line.
  2. Set the mechanical indicator lever and move onto the Army Stores Siding.
  3. Attach to the empty wagons at the narrow gauge loading dock platform.
  4. Move the wagons into the Wilmington Line resetting the mechanical indicator lever at the junction as you go.
  5. Move the loco and wagons to the Goods Shed to load the QLX wagons.
  6. After loading uncouple the loco and MTW wagons from the CCC and QLX wagons and move the MTW wagons progressively through the Goods Crane to load.
  7. Shunt the MTW wagons back to couple with the CCC and QLX wagons. Detatch the loco.
  8. Return the loco to Gladstone Depot and attach to the empty CCC and Tanker wagons stored at the end of the Fuel Depot Road.
  9. Move the wagons out of the depot and couple them to the wagons waiting in the Goods Shed.
  10. Return the loco to its starting position on Gladstone Depot.
Driving Notes:
  • You have permission to pass semaphore signals at stop provided you are satisfied that the road ahead is clear.
Top


Personal tools