SAR Scenario Gladstone Shunter

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m
m
Line 59: Line 59:
 
## Open the '''Driver List''' (bottom left of the screen) and select the loco from there - click the drivers '''Eye''' icon to jump to the loco.
 
## Open the '''Driver List''' (bottom left of the screen) and select the loco from there - click the drivers '''Eye''' icon to jump to the loco.
 
# Take a few moments to get your bearings. Use the [[image:Line_Index_Label.png|link=SAR_Index|Location Index]] (this link will open in this window) and click on '''Gladstone''' to load its location details and track plans. In each location details page:-
 
# Take a few moments to get your bearings. Use the [[image:Line_Index_Label.png|link=SAR_Index|Location Index]] (this link will open in this window) and click on '''Gladstone''' to load its location details and track plans. In each location details page:-
#*the [[image:Tab_PH_Grey.png|link=|75px]] tab will reveal the optional '''Interlocking Tower''' paths into and out of each location (where available).
+
#*the [[image:Tab_HM_White.png|link=|75px]] tab gives an overall summary of each location with a "potted" history (where available).
#*the [[image:Tab_TM_Grey.png|link=|75px]] tab will reveal the invisible [[image:Trackmark_Right.png|link=|alt=TM|8px]] '''Track Marks''' for '''Drive To''' commands.
+
#*the [[image:Tab_PH_Grey.png|link=|75px]] tab identifies the optional '''Interlocking Tower''' paths into and out of each location (where available).
#*the [[image:Tab_IN_Grey.png|link=|75px]] tab will show all active industries and their commodities.
+
#*the [[image:Tab_TM_Grey.png|link=|75px]] tab reveals the invisible [[image:Trackmark_Right.png|link=|alt=TM|8px]] '''Track Marks''' for '''Drive To''' commands.
#*the [[image:Tab_SW_Grey.png|link=|75px]] tab will give you the names, locations and settings of all junction switches as well as some switch sets you may want to use.
+
#*the [[image:Tab_IN_Grey.png|link=|75px]] tab lists all active industries and their commodities.
# Each location page has direct links to the next locations so you can explore along the route.
+
#*the [[image:Tab_SW_Grey.png|link=|75px]] tab describes the names, locations and settings of all junction switches as well as some switch sets you may want to use.
 +
# Each location page has direct links to the adjacent locations so you can explore along the route.
 
# When you are ready to start, reload the '''Peterborough Base Session''' page (click the '''Scenarios''' button on your current location page) and select this '''Scenario''' again or just use the '''Back''' button on your browser - whichever is quicker.
 
# When you are ready to start, reload the '''Peterborough Base Session''' page (click the '''Scenarios''' button on your current location page) and select this '''Scenario''' again or just use the '''Back''' button on your browser - whichever is quicker.
 
# Switch back to '''TRS19 Driver''' and press the '''P''' key to start the session.
 
# Switch back to '''TRS19 Driver''' and press the '''P''' key to start the session.

Revision as of 10:25, 4 April 2021

ArrowLeft.png   13   Gladstone Shunter  ArrowRight.png
A scenario in the SAR Peterborough Base Session
Shunting operations in Gladstone Yard and nearby sidings. Bottom

Shunter
 Duration:  40 minutes
 Loco:  SAR T 210 at Gladstone Depot
Other Unrostered Locos: none

Location Index

Location Index
Each location in the layout has a detailed set of track diagrams that provide a variety of information. The  Getting Started  guide below gives a summary of the information that is available.

To display the data click any Line Index graphic, or go to the bottom of the page for all the session links (all links will open in this window).
Getting Started:
  1. The first step is to pause the session by pressing the P key.
  2. Next locate your loco. Either:-
    1. Open the Finder Tool (press CTRL-F) and type, in the name field, the name of the loco. For example SAR T 210 (or just T 210 should be enough). Click the tick icon, OR
    2. Open the Driver List (bottom left of the screen) and select the loco from there - click the drivers Eye icon to jump to the loco.
  3. Take a few moments to get your bearings. Use the Location Index (this link will open in this window) and click on Gladstone to load its location details and track plans. In each location details page:-
    • the Tab HM White.png tab gives an overall summary of each location with a "potted" history (where available).
    • the Tab PH Grey.png tab identifies the optional Interlocking Tower paths into and out of each location (where available).
    • the Tab TM Grey.png tab reveals the invisible TM Track Marks for Drive To commands.
    • the Tab IN Grey.png tab lists all active industries and their commodities.
    • the Tab SW Grey.png tab describes the names, locations and settings of all junction switches as well as some switch sets you may want to use.
  4. Each location page has direct links to the adjacent locations so you can explore along the route.
  5. When you are ready to start, reload the Peterborough Base Session page (click the Scenarios button on your current location page) and select this Scenario again or just use the Back button on your browser - whichever is quicker.
  6. Switch back to TRS19 Driver and press the P key to start the session.


Tutorial:
Tutorial A tutorial on using these scenarios is provided in the link on the left. The link will open in this window


 Yard Map: 
Yard map

 Tasks: 

  1. Move the loco out of the  Loco  Depot and run tender first onto the Wilmington Line to the Gladstone Army Stores Junction about 1/3rd of a mile up the line.
  2. Set the mechanical indicator lever and move onto the Army Stores Siding.
  3. Attach to the empty wagons at the narrow gauge loading dock platform.
  4. Move the wagons onto the Wilmington Line resetting the mechanical indicator lever at the junction as you go.
  5. Move the loco and wagons to the  Goods Shed  to load the QLX wagons.
  6. After loading uncouple the loco and MTW wagons from the CCC and QLX wagons and move the MTW wagons progressively through the  Goods Crane  to load.
  7. Shunt the MTW wagons back to couple with the CCC and QLX wagons. Detach the loco.
  8. Return the loco to the  Loco  Depot and attach to the empty CCC and Tanker wagons stored at the end of the  Fuel  road.
  9. Move the wagons out of the  Loco  Depot and couple them to the wagons waiting in the  Goods Shed .
  10. Return the loco to its starting position in the  Loco  Depot.


Driving Notes:
  • The Wilmington Line is not signalled. Normally only one train is allowed on the line at any one time.
  • You have been issued with an authority ticket for the Wilmington Line which is valid to the Army Siding Junction.
  • You have permission to pass semaphore signals at stop provided you are satisfied that the road ahead is clear.
  • An Interlocking Tower is available for optional use at Gladstone for movements between the yard and the Wilmington Line. Click Location Index for details.
Strip Map

Links: All links will open in this window
ArrowLeft.png Scenarios
Session Scenarios List
Location Index
Location List
Rolling Stock
Rolling Stock
Industries
Active Industries
Top ArrowRight.png


This page was created by Trainz user pware in February 2021 and was last updated as shown below.


Personal tools