SAR Scenario Gladstone Shunter

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m
m
Line 81: Line 81:
 
# Attach to the empty wagons at the narrow gauge loading dock platform.
 
# Attach to the empty wagons at the narrow gauge loading dock platform.
 
# Move the wagons onto the '''Wilmington Line''' resetting the mechanical indicator lever at the junction as you go.  
 
# Move the wagons onto the '''Wilmington Line''' resetting the mechanical indicator lever at the junction as you go.  
# Move the loco and wagons to the <span style="color: black; background-color: yellow; font-weight: 700;">&nbsp;Goods Shed&nbsp;</span> to load the '''QLX''' wagons.  
+
# Move the loco and wagons to the <span style="font-weight: 700; color: black; background-color: yellow;">&nbsp;Goods Shed&nbsp;</span> to load the '''QLX''' wagons.  
# After loading uncouple the loco and '''MTW''' wagons from the '''CCC''' and '''QLX''' wagons and move the '''MTW''' wagons progressively through the <span style="color: black; background-color: yellow; font-weight: 700;">&nbsp;Goods Crane&nbsp;</span> to load.  
+
# After loading uncouple the loco and '''MTW''' wagons from the '''CCC''' and '''QLX''' wagons and move the '''MTW''' wagons progressively through the <span style="font-weight: 700; color: black; background-color: yellow;">&nbsp;Goods Crane&nbsp;</span> to load.  
 
# Shunt the '''MTW''' wagons back to couple with the '''CCC''' and '''QLX''' wagons. Detach the loco.
 
# Shunt the '''MTW''' wagons back to couple with the '''CCC''' and '''QLX''' wagons. Detach the loco.
# Return the loco to the <span style="font-weight: 700;"><span style="color: white; background-color: black;">&nbsp;Loco&nbsp;</span> Depot</span> and attach to the empty '''CCC''' and '''Tanker''' wagons stored at the end of the <span style="color: white; background-color: black; font-weight: 700;">&nbsp;Fuel&nbsp;</span> road.
+
# Return the loco to the <span style="font-weight: 700;"><span style="color: white; background-color: black;">&nbsp;Loco&nbsp;</span> Depot</span> and attach to the empty '''CCC''' and '''Tanker''' wagons stored at the end of the <span style="font-weight: 700; color: white; background-color: black;">&nbsp;Fuel&nbsp;</span> road.
# Move the wagons out of the <span style="font-weight: 700;"><span style="color: white; background-color: black;">&nbsp;Loco&nbsp;</span> Depot</span> and couple them to the wagons waiting in the <span style="color: black; background-color: yellow; font-weight: 700;">&nbsp;Goods Shed&nbsp;</span>.
+
# Move the wagons out of the <span style="font-weight: 700;"><span style="color: white; background-color: black;">&nbsp;Loco&nbsp;</span> Depot</span> and couple them to the wagons waiting in the <span style="font-weight: 700; color: black; background-color: yellow;">&nbsp;Goods Shed&nbsp;</span>.
 
# Return the loco to its starting position in the <span style="font-weight: 700;"><span style="color: white; background-color: black;">&nbsp;Loco&nbsp;</span> Depot</span>.</td>
 
# Return the loco to its starting position in the <span style="font-weight: 700;"><span style="color: white; background-color: black;">&nbsp;Loco&nbsp;</span> Depot</span>.</td>
 
</tr>
 
</tr>

Revision as of 16:40, 26 February 2021

 Gladstone Shunter 
Shunting operations in Gladstone Yard and nearby sidings. Bottom

Shunter
Each location in the layout has a detailed set of track diagrams that provide the following information:-
  • the names of the tracks, sidings and loops
  • the location of various facilities - stations, turntables, water columns, coal stages, engine sheds, active industries
  • the names of active industries and their products and consumables
  • the names and locations of trackmarks for Drive To and Drive Via commands
  • the names, properties and locations of track switches and lists of switch sets for particular movements
  • Enhanced Interlocking Tower paths for those locations that have EITs
Location Index
To display the location data click any Location Index graphic, or go to the bottom of the page for all the session links (all links will open in this window).
Duration: 40 minutes
Loco: SAR T 210 at Gladstone Depot
Other Unrostered Locos: none
Getting Started:
  1. The first step is to pause the session by pressing the P key.
  2. Next locate your loco. Open the Finder (press CTRL-F) and type, in the name field, the name of the loco. For example SAR T 210 (or just T 210 should be enough). Click the tick icon.
  3. Take a few moments to get your bearings. Use the Location Index (this link will open in this window) and click on Gladstone to load its location details and track plans. The Tab PH Grey.png tab will give you the EIT Paths that are available if you wish to use them. The Tab TM Grey.png tab will give you the location and names of the invisible Track Marks for Drive To commands. The Tab IN Grey.png tab will show the names and locations of all active industries and their commodities. The Tab SW Grey.png tab will give the names and locations of all junction switches as well as some switch sets you may want to use.
  4. When you are ready to start, reload the Peterborough Base Session page (click the Scenarios button on your current location page) and select this Scenario again or just use the Back button on your browser - whichever is quicker.
  5. Switch back to TRS19 Driver and press the P key to start the session.
Yard Map: Shunt Map
Yard map
Tasks:
  1. Move the loco out of the  Loco  Depot and run tender first onto the Wilmington Line to the Gladstone Army Stores Junction about 1/3rd of a mile up the line.
  2. Set the mechanical indicator lever and move onto the Army Stores Siding.
  3. Attach to the empty wagons at the narrow gauge loading dock platform.
  4. Move the wagons onto the Wilmington Line resetting the mechanical indicator lever at the junction as you go.
  5. Move the loco and wagons to the  Goods Shed  to load the QLX wagons.
  6. After loading uncouple the loco and MTW wagons from the CCC and QLX wagons and move the MTW wagons progressively through the  Goods Crane  to load.
  7. Shunt the MTW wagons back to couple with the CCC and QLX wagons. Detach the loco.
  8. Return the loco to the  Loco  Depot and attach to the empty CCC and Tanker wagons stored at the end of the  Fuel  road.
  9. Move the wagons out of the  Loco  Depot and couple them to the wagons waiting in the  Goods Shed .
  10. Return the loco to its starting position in the  Loco  Depot.
Driving Notes:
  • You have permission to pass semaphore signals at stop provided you are satisfied that the road ahead is clear.

Links: All links will open in this window
Scenarios
Session Scenarios List
Location Index
Location List
Rolling Stock
Rolling Stock
Industries
Active Industries
Top


This page was created by Trainz user pware in February 2021 and was last updated as shown below.


Personal tools