Superelevation Trainz22
(→For those who are curious...) |
(→For those who are curious...) |
||
Line 124: | Line 124: | ||
The spreadsheet is based on the following observations:<br> | The spreadsheet is based on the following observations:<br> | ||
* <span style="line-height:16pt;">With a given chord length and a curve angle of 90°, the calculated SuperElevation Degree will apply to any curve with the same chord length, whatever its curve angle.<br> Example: for a 90° bend with a chord length of 200 metres and a bank angle of 8°, we calculate a SuperElevation Degree = 21.5. <br> In Trainz, if this same bend were to be transformed to have an angle of 45°, the SuperElevation Degree = 21.5 value would still apply to produce a bank angle of 4.3°, the desired value. | * <span style="line-height:16pt;">With a given chord length and a curve angle of 90°, the calculated SuperElevation Degree will apply to any curve with the same chord length, whatever its curve angle.<br> Example: for a 90° bend with a chord length of 200 metres and a bank angle of 8°, we calculate a SuperElevation Degree = 21.5. <br> In Trainz, if this same bend were to be transformed to have an angle of 45°, the SuperElevation Degree = 21.5 value would still apply to produce a bank angle of 4.3°, the desired value. | ||
− | * | + | * For a curve with a given chord and angle, there is a strict correlation between the Superelevation Degree value and the degree of slope required.<br> Example: for a 90° curve and chord = 200 metres, a Superelevation Degree of 10 gives a slope angle of 4°, a Superelevation Degree of 20 gives a slope of 8°, etc... |
Latest revision as of 00:09, 11 October 2024
Contents |
[edit] What is superelevation in Trainz 22?
The "superelevation" or the slope of rails in curves is proposed since T:ANE. This page updates the instructions for Trainz 22
Important to note : The ‘Superelevation’ function worked very well with T:ANE and Trainz 2019. As of today (2024 october the 9th), it does not work with Trainz 22 and Trainz PE. This error has recently been rectified and Superelevation is now available again, but for Trainz 22+ owners only.
To resist centrifugal force and and not to wear out prematurely the outer rail, the track must be tilted on bends.
Applying a gradient to a curved section of track is called superelevation.
Here is the example of a machine launched to 80 kph in a curve of 500 meters of beam. The slope of the track has been set to 4 °.
To implement Superelevation in Trainz 22, follow the steps below :
On the tools palette,select the highlighted icone as shown on the opposite picture (1)
Clic on the track to select it (2) Clic on one of the submits of the selected track (3) |
[edit] Surperelevation : theoritical base
Everything that follows in this section is designed to give you the theoretical basis for calculating a superelevation.
In the next section, a spreadsheet will be provided to do all the calculations for you.
- The Superelevation (SE) is the height that the outside rail takes compared with the internal rail in a curve.
It is calculated as the diagram below shows it:
- Of the four variables above (G, V, R,g), one is unknown at start: the radius of the curve.
The diagram below shows how to determine it :
- Trainz 22 introduces an aditionnal concept for determining the superelevation of a curve: the degree of curvature.
Here, with a quarter-circle curve, the curve angle is 90°.
With a chord of a given length : |
The parameter 'Superelevation Degree' is depicted in the game as : the degree of superelevation of this track vertex (where 0 is none, and 1 is one degree bank per degree of curvature). |
[edit] Superelevation: how do we go about it?
To proceed to the calculations, download and save to your hard drive the spreadsheet Here
Proceed in two steps :
- measure the chord and arrow of your curve
- proceed to the calculations with the spreadsheet
Measure the chord and arrow of your curve :
In your Asset Pallet, select the spline 'ruler' <kuid:447125:108> Ruler Metric or <kuid:447125:109> Ruler Imperial
Measure the lengths of the chord and the arrow as shown opposite |
Procced to the calculations whith the spreadsheet :
[edit] For those who are curious...
The spreadsheet is based on the following observations:
- With a given chord length and a curve angle of 90°, the calculated SuperElevation Degree will apply to any curve with the same chord length, whatever its curve angle.
Example: for a 90° bend with a chord length of 200 metres and a bank angle of 8°, we calculate a SuperElevation Degree = 21.5.
In Trainz, if this same bend were to be transformed to have an angle of 45°, the SuperElevation Degree = 21.5 value would still apply to produce a bank angle of 4.3°, the desired value. - For a curve with a given chord and angle, there is a strict correlation between the Superelevation Degree value and the degree of slope required.
Example: for a 90° curve and chord = 200 metres, a Superelevation Degree of 10 gives a slope angle of 4°, a Superelevation Degree of 20 gives a slope of 8°, etc...