Talk:SAR Wilmington (Basic)

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
(Created page with "Track diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard g...")
 
m
Line 1: Line 1:
Track diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line when the Wilmington Line became an isolated narrow gauge branch line. Created to support the TRS19 version layout. Wilmington was the terminus of the line.
+
Track and switch diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line when the Wilmington Line became an isolated narrow gauge branch line. Created to support the TRS19 version layout. Wilmington was the terminus of the line.

Revision as of 21:26, 10 November 2019

Track and switch diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line when the Wilmington Line became an isolated narrow gauge branch line. Created to support the TRS19 version layout. Wilmington was the terminus of the line.

Personal tools