Talk:SAR Stone Hut

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
(Created page with "Track and interlocking tower paths diagram of Stone Hut on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown as it existed i...")
 
Line 1: Line 1:
Track and interlocking tower paths diagram of Stone Hut on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division). Shown as it existed in the early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line. The standard gauge line replaced the narrow gauge line from Port Pirie to Broken Hill making the Wilmington Line an isolated narrow gauge line until it was closed. Created to support the TRS19 version layout.
+
Track and interlocking tower paths diagram of Stone Hut on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) as it existed in the early 1960s. When the Broken Hill to Port Pirie line was standardised in 1969, the Wilmington Line became an isolated narrow gauge branch line until it closed in 1990. Created to support the TRS19 version layout.

Revision as of 22:16, 13 November 2019

Track and interlocking tower paths diagram of Stone Hut on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) as it existed in the early 1960s. When the Broken Hill to Port Pirie line was standardised in 1969, the Wilmington Line became an isolated narrow gauge branch line until it closed in 1990. Created to support the TRS19 version layout.

Personal tools