Talk:SAR Belalie North (Basic)

From TrainzOnline
Jump to: navigation, search

Track and switch diagram of Belalie North on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. The Broken Hill to Port Pirie line was converted to standard gauge in 1969 and deviated away from Belalie North. Created to support the TRS19 version layout.

Personal tools