How to Use Track Priority Markers

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m
m
Line 68: Line 68:
  
 
<table cellpadding="4" bgcolor=#c1e7e7>
 
<table cellpadding="4" bgcolor=#c1e7e7>
 +
<tr valign="top">
 +
<td colspan=2><span style="font-size: 17px; font-weight: 700;">Main Points:</span></td>
 +
</tr>
 
<tr valign="top">
 
<tr valign="top">
 
<td>[[file:DotPoint.JPG]]</td>
 
<td>[[file:DotPoint.JPG]]</td>

Revision as of 17:11, 14 September 2019

The information in this Wiki Page applies to both TANE and TRS19.

Contents

What are Track Priority Markers?

In Summary:
DotPoint.JPG Track priority markers are purple coloured track markers that are invisible in Driver Mode but visible in Surveyor Mode. They are used to direct specific trains through the track section where they are placed
DotPoint.JPG Track priority markers are NOT a substitute for Driver Commands or Interlocking Towers

Adding a Track Priority Marker

PriorityMarker1.png

Steps.PNG Steps:
  1. . Open the Track Tool
  2. . Select the Trackmark button
  3. . Select the Track Priority Marker
  4. . Click on the track location where the priority marker is to be placed


This will place the Priority Track Marker on the track and open its properties window.
PriorityMarker2.png

Click the label Priority 2 to select one of level 1, 2 (the default selection), or 3.


DotPoint.JPG Priority values have no set meanings but can be assigned to specific trains to force them through selected sections of track (the track sections are defined as between consecutive junction point sets)


Assigning Priority Levels to Trains

Each locomotive can be assigned a priority level of 1, 2 or 3. Priority 2 is the default level. Again, these values have no set meaning beyond what you decide they will mean.

For example you could assign priority 1 to express trains and 3 to slow general freight stopping trains.

PriorityTrain.png

Priority Marker Operation

Main Points:
DotPoint.JPG Priority Track Markers only work on AI controlled trains. They have no effect on manually controlled trains
DotPoint.JPG Priority Track Markers fool an AI train that has the same priority level into thinking that the path containing the marker is the shortest possible path, even when it is not
DotPoint.JPG If the priority level of the AI train does not match the priority level of the marker, then the AI will ignore the marker and select its own path which may be the one containing the priority marker
DotPoint.JPG If the specified path is blocked (e.g. by another train), then the AI will ignore the Priority Track Marker and find another path
DotPoint.JPG The direction that the Priority Track Marker is pointing has NO effect on its operation

Consider the situation represented in the diagrams below.

In Figure 1 three trains - Red, Green, Yellow - have been given priority levels of 1, 2 and 3 as shown. Each is given the driver command Drive to Trackmark or Navigate to Trackmark. If no Priority Track Markers have been placed then all three will take the shortest path assuming there are no blockages.

Priority Map - Priority NULL
Figure 1

In Figure 2 below, a Priority Track Marker has been placed on the top loop line and has been given a priority level of 1. All three trains have been given the driver command Drive to Trackmark or Navigate to Trackmark. The result will be that the red train will now take the Priority 1 path while the green and yellow trains are unaffected.

Priority Map - Priority 1
Figure 2

In Figure 3 below, a Priority Track Marker has been placed on the lower loop line and has been given a priority level of 3. All three trains have been given the driver command Drive to Trackmark or Navigate to Trackmark. The result will be that the yellow train will now take the Priority 3 path while the red and green trains are unaffected.

Priority Map - Priority 3
Figure 3

In Figure 4 below, two Priority Track Markers have been placed - one on the upper loop and the other on the lower loop - and set as shown. All three trains have been given the driver command Drive to Trackmark or Navigate to Trackmark. The result will be that the red and yellow trains will take their respective loop paths while the green train is unaffected.

Priority Map - Priority 1&3
Figure 4

In Figure 5 below, two Priority Track Markers have been placed on the lower loop line and set as shown. All three trains have been given the driver command Drive to Trackmark or Navigate to Trackmark. The result will be that the green and yellow trains will take the lower loop path while the red train is unaffected.

Priority Map - Priority 2&3
Figure 5

In Figure 6 below, Priority Track Markers have been placed on the both loop lines and set as shown. All three trains have been given the driver command Drive to Trackmark or Navigate to Trackmark. The result will be that no AI controlled trains will take the centre loop path. Remember that the Default Priority Level of every train is 2.

Priority Map - Priority 1, 2&3
Figure 6

The exception, shown in Figure 7 below, will occur when one or more of the Priority Track Marker paths have been blocked by a consist under AI or manual control. If all three trains have been given the driver command Drive to Trackmark or Navigate to Trackmark then only the red train will take its assigned path. The green and yellow trains will take the next available free path.

Priority Map - Priority 2&3 blocked
Figure 7




Trainz Wiki

TrainzWiki.png

More Tutorials and Guides to Using Trainz

Personal tools